Shafts/Temporary Structures
byStandard Design and Construction Guidelines for Microtunneling Committee
Part of: Standard Design and Construction Guidelines for Microtunneling
Abstract:
Shafts should be of a size to accommodate the equipment and pipe selected and to allow for safe working practices. If the shaft must accommodate the permanent works, it is the contractor's responsibility to include these requirements in the shaft design. Permanent works are designed by the engineer and specified in the contract documents.
Subject Headings: Shafts | Structural safety | Pipe sizes | Contracts and subcontracts | Contract documentation | Construction management
Return to search