Use of Coal Combustion By-Products as Low-Permeability Liners for Manure Storage Facilities
This chapter presents an overview of the use of compacted flue gas desulfurization (FGD) material as a low-permeability liner. It discusses the engineering characteristics of FGD materials...

Lifeline Performance of El Salvador Earthquakes of January 13 and February 13, 2001
Prepared by the Council on Disaster Reduction and Earthquake Investigation Committee of Technical Council on Lifeline Earthquake Engineering of ASCE. ...

Atico, Peru Mw 8.4 Earthquake of June 23, 2001
Prepared by the Post Earthquake Investigation Committee of the Technical Council on Lifeline Earthquake Engineering of ASCE. In the late afternoon...

Past and Future of Construction Equipment�Part IV
The development of construction equipment has followed the major changes in global transportation. In 1420, Giovanni Fontana was dreaming of and diagramming dredging machines. Development...

An Alternative Approach
An innovative foundation system at a Virginia power plant relies on columns constructed via jet grouting to support elevated units that reduce pollution. The approach required less drilling,...

The Accuracy of Extrapolated Design Estimates with Hydrologic and Environmental Models
Extrapolation error in water resources and environmental modeling has not been the subject of adequate study in the past. In research and design, estimates obtained from regression models...

Advancing Under London
Bored tunnels account for more than 20 percent of the Channel Tunnel Rail Link, the high-speed rail line that will connect the Channel Tunnel with London upon its completion in 2007. In...

Design Loads
This chapter discusses the types of loadings that should be considered when designing overhead power lines utilizing fiber-reinforced polymer (FRP) poles. For infrastructure applications...

Assembly and Erection
This chapter is intended to provide recommendations on transporting, handling, assembling, and erecting fiber-reinforced polymer (FRP) poles. An important consideration is that FRP poles...

The Nisqually, Washington, Earthquake of February 28, 2001
Lifeline Performance
Prepared by the Technical Council on Lifeline Earthquake Engineering of ASCE. This TCLEE Monograph details the effects of the Nisqually, Washington,...

The Chernobyl Problem
When the infamous accident at the Chernobyl Nuclear Power Plant occurred in April 1986�a catastrophe that involved an explosion that blew off the top of one of the plant's...

Update of ASCE Manuals and Reports on Engineering Practice No.74 Guidelines for Electrical Transmission Line Structural Loads
For many months there has been doubt that the latest version of ASCE Manuals and Reports on Engineering Practice No. 74. Guidelines for Electrical Transmission Line Structural Loading,...

Effect of Aluminum Compression on ACSR Conductor Sags at High Operating Temperatures
Deregulation and restructuring are sweeping the electric utility industry in the United States. As a result, many utility engineers are analyzing, re-rating, and upgrading their most critical...

Settling Down
Engineers in Florida will prepare the sandy foundation of a future power plant by preloading it with sand for as long as a year....

Use of New Liner In Water Distribution System
For years there has been interest in rehabilitation of water distribution systems to provide quality drinking water and to reduce breaks in the water system service. Much work has been...

Monitoring Two Tunnels
Two pilot projects for bored tunneling in soft soil have been undertaken in the Netherlands under the authority of the Centre for Underground Construction: the Second Heinenoord Tunnel...

Redesigning the San Roque Dam
Engineers updated a 20-year-old design for the San Roque Dam in the Philippines to save time and money and improve the dam's ability to withstand earthquakes. The structure...

The Many Faces of RCC
The Chinese government, under an aggressive move to boost its hydroelectric power output, is building an extensive system of dams nationwide. Chinese engineers have developed innovative...

Nuclear Shutdown
The lengthy process of decommissioning�and in some cases dismantling�a commercial nuclear power plant is unlike any other project. The few plants that have been decommissioned are providing...

Pushing Back
(Available on in special edition) The design for the $3.5-million Cameron Run tunnel rehabilitation project involved a tricky and relatively unproven method of pushing corrugated steel...

 

 

 

 

Return to search