Human Factors and Communication Problems in Foundation Engineering
Recent findings in non-engineering fields related to human factors are reviewed with emphasis on communication difficulties. Foundation engineering tasks are discussed in the context of...

Structural Foundation Practices for Highway Projects
The state-of-practice by State transportation agencies, in the area of structural foundations, is compared between the late 1970's and the present. The structural foundation...

Augered Cast-in-Place Piles
Development of the augered cast-in-place pile system from origination in the late 1940's to the present state of the art is presented, with methods of pile placement, including...

Owner and Designer Advantages Derived from Use of Construction Consultant
There are two significant ways that an experienced construction consultant can assist both the owner and the designer/engineer in obtaining an economical and practical structure. Constructibility...

A Lateral Load Test on Seven Foot Diameter Caissons
Seven foot (2.1 m) diameter caissons (drilled shafts) were designed to support a mainline eastbound bridge and an off-ramp of Interstate Highway 70 in Glenwood Canyon, Colorado. A lateral...

Geophysical and Nuclear Methods for Non-Destructive Evaluation of Caissons
Non-destructive testing techniques were used to confirm the concrete integrity on the caisson foundations for the 45-story Ohio Corporate Headquarters building in Cleveland, Ohio. The...

Pile-Drilled Caisson Combination for Foundation of High Rise Building
The analysis and evaluation of several alternatives for foundations of a high rise office building is presented, which resulted in the selection of a combination of high capacity piles...

Combination Drilled Shaft and Driven Pile Foundation for a High-Rise Building
A case history is presented which discusses the design and construction of a combination drilled shaft and driven pile foundation which supports a high-rise in San Francisco. Drilled piers,...

Long Term Performance of High Rise Mat Foundation
The vertical movement of the foundation soils for a multi-story high rise office tower was monitored during foundation excavation, tower construction and the 25-year in-service period...

Complex High-Rise Foundation Design and Construction
The substructure design and construction of a 60 story office tower in downtown Chicago is described. The presence of existing belled caissons on hardpan required use of filtered dewatering...

Interaction of Geology, Construction Practice and Foundation Design
The influence of geologic knowledge and construction practices on the geotechnical foundation design process has been assessed and summarized. Particular emphasis has been given to the...

Integration of Research Into Design Practice
A widely held perception is that research results flow from the research community along the paths of professional publication into the design offices, where they find practical application....

Scenarios for Land Use on Delaware Barrier Beaches
Design criteria developed from tenets of the industrial-scientific world view emphasized capital-intensive use of barrier beaches for maximum economic productivity, whereas bioregional...

Building on the Coastal Barriers Resource Act
In 1982, the Coastal Barrier Resources Act (CBRA) was enacted to minimize the loss of human life, wasteful expenditure of Federal revenues, and damage to fish and wildlife and other natural...

The South Carolina Coast II. Development and Beach Management
The variety of development and conservation areas is superimposed on a wide range of erosion and accretion histories. Lack of construction setbacks has contributed to the general but probably...

Fouling and Wood-Boring Communities Distribution on the Coast of Rio De Janeiro
The paper reports on a study of the dynamics of fouling communities and the distribution of wood-boring organisms along the coast of Rio de Janeiro, Brazil, which was motivated by the...

The Coastline Between Rio De Janeiro and Cabo Frio
The coastline between Rio de Janeiro and Cabo Frio is characterized by successive long beach arcs, oriented in the East-West direction. The beaches are separated by rocky headlands resulting...

The CADD Landfill
Designing landfills with CADD, engineers have reduced cut and fill calculations from two weeks to two days. Aerial surveys arrive on magnetic tapes and are loaded into computers by in-house...

Managing a Megaproject
The tunnel beneath the English Channel is an unusual construction project because of the private sector financing of infrastructure as well as the price, $9 billion, and the international...

Selected Papers from Chinese Journals of Structural Engineering
This book is an initial effort to introduce selected papers from journals published by the China Civil Engineering Society to ASCE membership. The twenty papers in this volume were selected...

 

 

 

 

Return to search