Extensive Civil Penalties Apply?Lessons Learned Since Waterpower '89
Section 12 of ECPA authorized the FERC to assess civil penalties in enforcing Part I of the Federal Power Act and its implementing regulations, as well as the terms and conditions of hydropower...
Hydraulic Model Studies for Non-Federal Projects at Federal Dams?A Case Study
This paper will discuss the hydraulic model studies for hydropower projects developed by Arkansas Electric Cooperative Corporation (a non-federal entity) at existing Corps of Engineers...
Private Hydropower Projects: Exporting the American Experience
This paper addresses different aspects of exporting the American knowledge and experience in the private development of small-scale hydropower projects. It details the 'export'...
Technology Transfer for Small Hydro
The wide range of different definitions of what constitutes a small hydroelectric power plants is discussed and the conclusion is drawn that this definition should be based more on the...
Decision Rules for Reservoir Releases
One of the problems faced with computer modeling of a multi-reservoir, hydro-power system is making decisions on how releases will be made. Reservoirs many times have multiple demands...
The Wisconsin River System Operations Model: WIRSOM
The passage of the Electric Consumers Protection Act of 1986 requires the Federal Energy Regulatory Commission to give equal consideration to non-power as well as power values in hydroelectric...
A Flow Forecasting System for Hydro Power
The flow forecasting system comprises a network of meteorological stations, a weather forecasting model, and a watershed hydrologic model, implemented in a microcomputer. The meteorological...
Hand Held Powerhouse Control Console or Portable Data Terminal
The Portable Data Terminal (PDT) is a very small light weight hand held computer terminal that communicates with the control system computer by radio. An operator monitors power plant...
A Hydroelectric Plant Operator's Assistant
This paper describes a PC based application designed to assist in the process of enhancing the performance of multi-unit hydroprojects. Optimization considerations, uses of the Operator's...
Dam Safety Hydrologic and Seismic Evaluation of TVA'S Beech Dam
Beech Dam is part of the Beech River watershed resource development located in Decatur and Henderson counties in west Tennessee. The development consists of eight dams and approximately...
Rocky Mountain Project?Probable Maximum Floods
Probable maximum floods (PMF's) were estimated for use in designing spillways for the lower reservoir main dam and two auxiliary pool dams at the Rocky Mountain pumped-storage...
Validation Studies on Indexed Sequential Modeling for the Colorado River Basin
A method called indexed sequential modeling (ISM) has been developed by the Western Area Power Administration to estimate reliable levels of project dependable power capacity (PDC) and...
Operation of Hydropower Plants Considering Daily Streamflows
Operation of hydropower plants is a sequential decision process often modeled as a dynamic programming problem. Typically, such formulations consider monthly stages assuming that monthly...
Streamflow Gaging in a Remote Area Using Cellular Telephone Telemetry
A case study will be presented describing the utilization of cellular phone technology in a remote sensing situation. Because expected annual energy estimates are vital in planning small...
An Artificial Intelligence Approach to Multiple Reservoir Operation
The modeling of complex river basins using symbolic computer languages, object-oriented programming and knowledge-based reasoning facilitates, the application of optimization techniques...
Evaluating Hydro Project Benefits with the POWRSYM Production Cost Model
The contribution that a hydro peaking project or pumped-storage project makes to reducing system operating costs can be determined only by modeling the project's operation...
Examples of Risk Assessment in Dam Safety Decision Making
Three examples of risk-based dam safety evaluations performed for dam users or operators are summarized. These studies were conducted by major U.S. engineering firms and involved experienced...
Colorado River Probable Maximum Floods
Upper limit design rainstorms (ULDRS) were developed for three locations in the Colorado River drainage above Hoover Dam. For each location, the rainfall magnitudes, spatial and temporal...
Rehabilitation of the Dams at the Crescent and Vischer Ferry Hydroelectric Projects
This paper reviews the dam rehabilitation design and construction techniques used at the New York Power Authority's Crescent and Vischer Ferry Dams. The following are the...
Civil Design of the Sidney A. Murray Jr. Hydroelectric Station
This paper addresses the general civil design of the Sidney A Murry Jr Hydroelectric Station with special emphasis on the design requirements of the project's unconventional...
Return to search