Information Entropy and Environmental Engineering
Environmental engineering decisions are often made with limited information. In such cases it is useful to express uncertain quantities with a probability distribution. The use of information...
The Mission of the Corps of Engineers, South Pacific Division, in Hazardous/Toxic Waste (HTW)
This paper discusses the various roles and relationships that the South Pacific Division has for HTW activities within the division's four-state area (CA, AZ, NV, and UT)....
Electronic Computation
This proceedings,
Composting: Computing the Right Recipe
A pinch of this and a pinch of that is an adequate instruction for most good cooks. But for composting, facility managers need a recipe that specifies the right ingredients and exact amount,...
Breaking Down the Barriers
The structural engineering of multistory buildings is a complex and time-consuming chore, but new design and analysis tools can greatly simplify the task. The article traces the development...
Probing the Golden Gate
The Golden Gate Bridge has just come through the most detailed analysis ever attempted in its 53-year-old history. This analysis was squeezed into a desktop computer that calculates twice...
Evaluating the Dynamic Operating Benefits of Hydro Power Plants
In 1986, the Electric Power Research Institute asked Decision Focus to develop a new planning model to quantify the dynamic operating benefits of power technologies that offer operating...
Design of Extended Length Submerged Traveling Screen and Submerged Bar Screen Fish Guidance Equipment
The hydropower projects on the Snake and lower Columbia Rivers in the Pacific Northwest are unique because these rivers are also the spawning grounds for migratory salmon. The salmon swim...
Fair Value, Net Investment and Relicensing
The Federal Power Act ('Act') requires that a Federal Energy Regulatory Commission ('FERC') license receive only 'net investment'...
Using Project Management Techniques in Hydro-Relicensing
To answer a pressing need for managing today's complex process and requirements of hydro relicensing, Central Maine Power Company (CMP) has applied the principles of project management,...
Extensive Civil Penalties Apply?Lessons Learned Since Waterpower '89
Section 12 of ECPA authorized the FERC to assess civil penalties in enforcing Part I of the Federal Power Act and its implementing regulations, as well as the terms and conditions of hydropower...
Private Hydropower Projects: Exporting the American Experience
This paper addresses different aspects of exporting the American knowledge and experience in the private development of small-scale hydropower projects. It details the 'export'...
Technology Transfer for Small Hydro
The wide range of different definitions of what constitutes a small hydroelectric power plants is discussed and the conclusion is drawn that this definition should be based more on the...
Hand Held Powerhouse Control Console or Portable Data Terminal
The Portable Data Terminal (PDT) is a very small light weight hand held computer terminal that communicates with the control system computer by radio. An operator monitors power plant...
A Hydroelectric Plant Operator's Assistant
This paper describes a PC based application designed to assist in the process of enhancing the performance of multi-unit hydroprojects. Optimization considerations, uses of the Operator's...
Examples of Risk Assessment in Dam Safety Decision Making
Three examples of risk-based dam safety evaluations performed for dam users or operators are summarized. These studies were conducted by major U.S. engineering firms and involved experienced...
Rehabilitation of the Dams at the Crescent and Vischer Ferry Hydroelectric Projects
This paper reviews the dam rehabilitation design and construction techniques used at the New York Power Authority's Crescent and Vischer Ferry Dams. The following are the...
Civil Design of the Sidney A. Murray Jr. Hydroelectric Station
This paper addresses the general civil design of the Sidney A Murry Jr Hydroelectric Station with special emphasis on the design requirements of the project's unconventional...
Evaluating History?The Edison Sault Powerhouse
The hydroelectric facility owned by the Edison Sault Electric Company at Sault Ste Marie, Michigan was an engineering marvel when it was designed and constructed. This paper explores the...
Pressure-Time Method Using Modern Practices
Over the past twenty years, Hydro-Quebec has modernized the pressure-time method of flow measurement, a method which is generally economical but sometimes difficult to apply. Starting...