Mini Hydro at Low Cost
The Kingsley Dam is an existing irrigation dam that has been retrofitted with electric generating capacity. The project was completed 6 months ahead of schedule without interrupting irrigation...
Retrofit Services: Responding to Today's Market
As a result of the decline in demand for new nuclear power plant construction the nuclear industry has experienced a major change in the nature of business opportunities. To meet the rising...
Look Back and Learn
The cancellations of some nuclear power plants are being attributed in part to cost overruns due to construction-related problems. The experienced civil construction engineer involved...
Decentralization of Nuclear Power Plant Engineering
The cost of nuclear power construction in the past two decades has increased by an order of magnitude, forcing utilities and A/E's to look for ways to reduce engineering and...
Seismic Pope Support Construction Practices
During the mid 1970's the regulatory agencies controlling the design and construction of nuclear power plants began to demand stricter adherence to already existing codes...
Nuclear Power Plant Delays: Probable Causes and Resolutions
The nuclear power industry in the United States is experiencing technological as well as construction and operation problems in nuclear facilities. It is the intent of this paper to review...
Structural Retrofit for Nuclear Power Plants
Retrofitting of nuclear power plants is a major concern these days. Recent rulings of regulatory agencies have affected most of the generating plants in some way. The lessons learned from...
Nuclear Outages: An Approach to Project Controls
The nuclear refueling outage is short-lived, fast paced, and very costly to the nuclear utility. To better control modification expenses and reduce outage-related costs, utilities are...
Modifications At Operating Nuclear Power Plants
In these days of continuing regulatory requirement changes and high interest rates, the engineering of structural modifications for operating nuclear power plants has taken on greater...
Modifying Piping Systems During a Plant Outage
This paper describes methods to reduce problems in design and planning of modifications to piping systems during a nuclear plant outage. Significant differences between original design...
Intact Decommissioning Alternative for Nuclear Power Plants
Previous studies of decommissioning options for nuclear power plants have examined potential alternatives such as immediate dismantlement, entombment, and moth-balling. This paper describes...
A Model for Nuclear Waste Shipping and Storage
A management option for spent fuel assemblies from nuclear power plants is storage in away-from-reactor (AFR) storage facilities. The purpose of this paper is to preseent a new mathematical...
Oconee Spent Fuel Rerack
Spent fuel storage problems facing electric utilities with nuclear generation are growing more critical as existing spent fuel storage capacity is utilized. Due to the inaccessibility...
Coping with Transition: Improving the Management Process
At Arkansas Power & Light Company, the Energy Supply Department has some 2,000 employees and operates (in addition to providing General Office engineering, technical, and administrative...
Making Treatment Plants Work
For the most part, past design criteria that have been used were based primarily on historical information from plants that worked or general rule of thumb criteria. With the increasing...
Project Management for the Upper Harlem Electrification Project
The Upper Harlem Electrification Project consists of a 28 mile extension of 700 V. D. C. under-running third (current carrying contact) rail electrification from North White Plains, New...
Seismic Probabilistic Risk Assessment for Critical Facilities
Probabilistic Risk Assessment (PRA) for seismic events is currently being performed for nuclear power plants. The background on seismic PRA is presented along with a basic description...
Electric Utility Noise Emissions
Environmental regulations require that impact statements for new electric utility and industrial power plants include an evaluation of noise emissions. Variations in equipment sound power...
Environmental Noise Control for Industrial Facilities
The authors present a brief discussion of the criteria used to evaluate environmental noise control problems. Then, they discuss environmental noise control in the power, petroleum, gas...
Maximum Water Source Utilization Using Lotus 1-2-3
This paper discusses the use of microcomputers to determine the optimum mix of sources for the Fargo-Moorhead area's water supply network. The area's major water...
Return to search