Concrete Bridge-Tunnel Has No Deck
Engineers solve the problem of how to economically span a single track railroad without interrupting train traffic. Highway fill was placed over post-tensioned precast concrete arch sections...

Precast Veneer Replaced By All-Precast Structure
Utilizing engineering solutions to architectural problems greatly enhanced the architectural appearance of this building. Long-span prestressed, light weight concrete beams, post-tensioned...

Rebar Splices: Cutting Costs, Avoiding Errors
Practical advice for cost-cutting in reinforced concrete construction suggests improvements in accepted design and specifications, procedures and specific items. Brief recommendations...

Philadelphia Bridge Sparked Growth of Prestressed Concrete in the U.S.
Prestressing has been used for centuries. For instance, iron bands were heat-shrunk over built-up wooden wheels to increase their resistance to damage. In 1888, a man named Jackson from...

Concrete Canoe Racing Stimulates Interest in ASCE Student Chapter
Concrete Canoe construction and racing have become a very popular ASCE Student Chapter activity. Such a program can publicize a chapter's activities in general and can serve...

Nambe Falls Dam�First Mechanically Prestressed Concrete Dam in U.S.
An unusual combination of a curved earth embankment, a concrete gravity thrust block, and concrete thin arch prestressed with embedded vertical flat jacks has created Nambe Falls Dam,...

Precast Liners May Cut Tunnel Cost 25%
On the Bureau of Reclamation's Buckskin Mountain's Tunnel in Arizona, the low bid was for $58,000,000, about $21,000,000 less than the low bid for design using...

The Story of Cement, Concrete and Reinforced Concrete
When the dawn of history, man has sought for materials to cement stone and brick together. When rebuilding the Eddystone lighthouse in 1756, John Smeaton recognized ordinary lime morter...

George Washington Bridge Redecked with Prefabricated, Prepaved Steel Panels
The Port Authority of New York and New Jersey has embarked on a �37,000,000 project to totally replace the upper roadway of the 46-yr old George Washington Bridge. The scheme, chosen from...

Dallas Expressway Quickly Rehabilitates With Aid of Giant Cold-Milling Machine
The Dallas, Texas Central Expressway, one of the most intensively used roads in the U.S., was plagued by a deteriorating and bumpy surface, and poor skid resistance. The pavement consisted...

Texas Uses Fabric to Protect Pavement from Cracks
Thin asphalt concrete overlays are susceptible to reflective cracking, which is the migration of the cracks in an old pavement into and subsequently through its overlay. To find a remedy...

State-of-the-Art Report Composite or Mixed Steel-Concrete Construction for Buildings
This report examines the interacting behavior of concrete with structural steel in building construction. Topics covered include composite columns, composite beams, trusses, and slabs,...

The birth and growth of history's most exciting building material
Not until the early decades of this century did this most revolutionary of all structural materials arrive-prestressed concrete. Developed in Europe, prestressed concrete began its rapid...

Concentric Waste-Treatment Plant Saves Land
An activated-sludge treatment plant in Camden, N.Y. has several innovations: the principal one is the use of concentric tanks�� as distinct from the usual way of having separate, isolated...

California Soon to Have Platform in 850 Ft of Water
Exxon's oil drilling and production platform, to be placed off Santa Barbara, Calif. next July, will stand in water twice as deep�� 850 ft versus about 420 ft�� as any other...

Paul Bunyan Among Offshore Steel Structures
The world's two largest drydocks, the larger 1,150 x 800 ft in plan were used to assemble on land the four steel jackets. They now stand in the North Sea in about 400-ft of...

Condeep�In 400 Ft of Water, Concrete Caisson Requires No Piles
The Condeep structure consists of (1) 19 cylindrical tanks each 66-ft diam and 164-ft high that together will store up to 900,000 bbl of oil; (2) the extension upward 300-ft more of three...

Supertanker Fixed Berth in Open Ocean
The oil terminal offshore Tomakomai, Japan, is the world's first fixed dock in open ocean. It must withstand 150 mph typhoon winds. To minimize time, cost and danger of open...

Concrete Barge of First Totally Offshore LPG Facility
Some 20 miles off Java, below waters 95-ft to 135-ft deep, is the Ardjuna Field, from which oil and gas soon will be taken. The adjacent coastal land is marshy, so onshore storage would...

New Orleans Grows on Deep Piles
In the New Orleans area, tall buildings must be supported by piles extending at least into the preconsolidated clays at -150-ft (-46-m) or so. Settlement is much too severe and uneven...

 

 

 

 

Return to search