Constructed Wetlands at Mesquite, Nevada
Subsurface flow (SF) wetlands are used to provide effluent polishing following treatment in an aerated lagoon at Mesquite, Nevada. General SF wetland design methodology is discussed in...

Reliability-Based Estimates of Wetland Detention Times for Wastewater Treatment
Determination of the hydraulic residence or detention time is often the first step in design of wetlands constructed for wastewater treatment. Current methods for estimating wetland detention...

Inventory of Constructed Wetlands for Municipal Wastewater Treatment in the U.S.
The U.S. EPA's Risk Reduction Engineering Laboratory is conducting an inventory of constructed wetlands (CW) for municipal wastewater treatment in the U.S. The inventory is...

Electronic Computation
This proceedings, Electronic Computation, consists of 46 manuscripts presented at the Tenth Conference on Electronic Computation held parallel...

Approximate Methods and Verification Procedures of Structural Analysis and Design
This proceedings, Approximate Methods and Verification Procedures of Structural Analysis and Design, contains selected papers presented at...

Connecting With DOTs
Want to bid on projects from state departments of transportation? First make sure your firm can translate computer-assisted drafting (CAD) drawings into different computer file formats....

Breaking Down the Barriers
The structural engineering of multistory buildings is a complex and time-consuming chore, but new design and analysis tools can greatly simplify the task. The article traces the development...

LRFD: Still Waiting
Introduced in 1986, load and resistance factor design (LRFD), has a way to go before it becomes standard practice for steel design. LRFD-based design typically results in savings on gravity...

CADD for Export
By using sophisticated structural design software and high-speed PCs, engineers in Pittsburgh overcame myriad problems when designing a highrise industrial tower in India. First, they...

More Power to the Allegheny?Design of the Allegheny 8 & 9 Hydroelectric Stations
The 13 MW Allegheny 8 Hydroelectric Station and the 17 MW Allegheny 9 Hydroelectric Station are located on the Allegheny River in the Commonwealth of Pennsylvania. The generating facilities...

Development of a New Hydraulic Design Tool for Spiral Casing/Distributor Geometry
A novel computational model has been developed to predict highly complex turbulent flow in a combined spiral casing/distributor geometry. Validation of the computational model against...

Ferroresonance & the Snettisham Hydroelectric Project
Key system features of the Snettisham power plant in Alaska will be highlighted along with a discussion of the operational problems encountered due to a ferroresonant condition. The project...

Design Considerations for Radial Key Retrofit
A practise that is becoming more and more common is to retrofit hydro-electric generators with Radial Key Systems. There are significant design considerations that must be made to ensure...

Utilizing Wetlands for Stormwater Retention
The design steps an engineer uses to develop natural wetlands to provide flood control while continuing to retain their natural functions will be analyzed. This paper will include a discussion...

The Stabilization of Minidoka Powerplant and Dam
The rehabilitation of structures can pose numerous challenges to the engineer. The structure historical preservation, the benefit cost ratio of the rehabilitation, and the stability of...

Bishop Intake #2 Spillway Modifications: A Case History
This paper covers the history of the events leading to the modification of Southern California Edison's (SCE) Bishop Intake 2 to pass a site specific design flood. From the...

The Replacement of Penstocks at TVA Ocoee II Power Plant
The Tennessee Valley Authority (TVA) replaced the steel penstocks at its Ocoee II power plant near Ocoee, Tennessee. A total replacement was necessary because of severe corrosion on the...

Rehabilitation of the Dams at the Crescent and Vischer Ferry Hydroelectric Projects
This paper reviews the dam rehabilitation design and construction techniques used at the New York Power Authority's Crescent and Vischer Ferry Dams. The following are the...

Outlet Works Modifications at Abiquiu Dam
For the installation of a hydroelectric project at the Corps of Engineer's Abiquiu Dam in New Mexico, outlet works modifications that would not affect the structural integrity,...

Civil Design of the Sidney A. Murray Jr. Hydroelectric Station
This paper addresses the general civil design of the Sidney A Murry Jr Hydroelectric Station with special emphasis on the design requirements of the project's unconventional...

 

 

 

 