Job-Site Innovations Slash Time, Cost of Constructing Canada's Tallest Skyscraper
In Building Canada's tallest office building, the 72-story First Bank Tower in Toronto, owner-developer Olympia & York introduced several job site innovations that...
First Bridge Across the Yukon River
Until recently, the Yukon River was a major obstacle in constructing a roadway to the oil-rich North Slope of Alaska. But on October 10, 1975, that obstacle was hurdled when the first...
Impermeable Asphaltic Concrete Pond Liner
An impermeable dense hydraulic asphaltic concrete solar evaporation pond liner was developed by the Southern California Edison Co. for the Mohave Generating Station, Clark Co., Nevada....
Structural Failures and How to Prevent Them
Reducing failures of buildings and other structures requires compentent design; clear communication of that design to the contractor by means of engineering drawings, etc.; careful and...
Earth Retention by Drilled Reinforced Concrete Caissons
A hillside fill is stabilized by the construction of drilled reinforced concrete caissons. The fill supports a building which houses equipment important to a manufacturing process. Other...
Landmark Erie Canal Structure Rehabilitated
The lower level of the Broad Street Bridge, which dates to 1823, was an aqueduct which carried the Erie Barge Canal over the Genessee River in Rochester, New York. The history of this...
Falsework Eliminated in Bridge Erection
The U.S. Highway 50 bridge just east of North Vernon, Ind., is one of the first applications in this country of the precast, prestressed concrete box girder design erected without falsework....
Desperate Need to Slash Construction Cost of New Subways
Subways and subway stations cost far too much to build in the U.S. Whereas Londoners recently built 3-1/2 miles of subways and subway stations for only $18,000,000, the Washington Metro...
Methods of Structural Analysis
Proceedings of the National Structural Engineering Conference, Methods of Structural Analysis, an ASCE Structural Division Specialty Conference held at the University of Wisconsin, Madison,...
Planning and Design of Tall Buildings
Scope Index
This report, Scope Index, was originally part of Joint Committee Report 1 as Schedule 2.1. It is an alphabetical listing of the scope of the various chapters of the Monograph on Tall Buildings....
TWA Hangars of Thin Shell Design
TWA hangars at the Kansas City International Airport match the shape of the giant jets. The design molds hyperbolic paraboloid concrete shells into an efficient shop area. Since the design...
Pipeline Bridge Uses Timber Arches
An arch bridge is utilized for the purpose of providing a river crossing for a water supply pipe. Tidal influence, an unfavorable riverbed situation complicated by estuarial and other...
Runway Rebuilding with Daily Use
At Ontario the main runway was rebuilt and 4-inch bituminous overlay put down at night while the runway was in daily use. Existing pavement was portland cement concrete with bituminous...
Improving Your Writing�� Part II
Whereas Part I on Improving your writing (Jan., '75) talked about how to find something to say, this article (Part II) focuses on how to say it clearly, simply, forcefully....
9000 psi Concrete�� Why? Why not�
High strength concrete is being used in many high-rise apartment and office buildings. In this case, high strength means 9000 psi (62.0 MPa). Quality control, aggregate availability and...
Reinforced Earth Bridges Highway Sinkhole
Faced with an unusual sinkhole condition, the Pennsylvania Department of Transportation decided to utilize a two-way reinforced earth slab in conjunction with a subsurface grouting program...
News in Bridge Decks
This is the second of two articles on short span bridges. The first, in the July issue, described cost-cutting ideas in design. This article focuses on bridge decks: expansion joints,...
A Fail-Safe Subaqueous Concrete Sewer
Describes the design and installation of a unique, tri-gasketed 87-in. (2210 mm) diameter reinforced concrete sewer force main. The total system is approximately 14,000 ft (4,300 m) long,...
Bailey's Crossroads: A/E Liability Test
In March 1973, a 24-story reinforced concrete building under construction at Bailey's Crossroads, Va., partially collapsed causing a total collapse of an adjoining parking...
Landmarks in Reinforced Concrete
To properly understand the significance of ASCE'S National Historic Civil Engineering Landmarks the instrumental steps in engineering history leading up to the landmarks period...
Return to search