High Level Radioactive Waste Management 1991
The proceedings of the second annual international conference on High Level Radioactive Waste Management, held on April 28 - May 3, 1991, Las Vegas, Nevada, provides information on the...

Unit Pricing and Unbalanced Bids
Unit price contracts were meant to provide a simple and equitable way to pay contractors. However, to offset the uncertainties inherent in construction, contractors unbalance bid items....

Setting Standards in San Diego
Most engineering firms have developed specifications and standards that become the bible for project-related design issues�and no two firms are the same. On complex, large-scale projects...

Pumped Storage Promise
With many utilities facing potential shortfalls in generating capacity, pumped storage hydro plants could be a key to meeting peak-period energy demand in the 1990s. Pumped storage plants...

Where's the Competition?: The Real Threats to Project Relicensing
The real potential competition in relicensing hydroelectric facilities is for use of the water and land resources currently dedicated to hydro power production. Relicensing applicants...

When FERC Investigates Your Unlicensed Project: A Five-Point Protection Plan
A FERC investigation into a project's jurisdictional status poses the potential for substantial risks and costs. This paper outlines a 'five-point protection...

Dealing with the Difficult Utility
The experience of an independent hydroelectric power developer, STS HydroPower, Ltd. (STS), involved in the full scope of hydroelectric activities is desribed. The purpose of the paper...

Small and Low Head Pumped Storage Projects
With the recent completion of several very large pumped storage projects, the perception of a hydroelectric pumped storage project in some power industry circles may be that of a project...

The PEC Headworks Project?A Cooperative Hydropower Development
The PEC Headworks Project is a single-unit hydroelectric facility located at the headworks of the Potholes East Canal at O'Sullivan Dam on the Potholes reservoir near Moses...

Lake Siskiyou Power Project
The Lake Siskiyou Power Project was constructed at the foot of the existing Box Canyon Dam on the Sacramento River in Northern California. Major project features included the construction...

Undeveloped Hydropower Resource Potential
The public hearings conducted as part of the National Energy Strategy produced testimony that concluded that the potential for development of hydropower was not well defined. As a result,...

AgriMet/Hydromet?Satellite Telemetry Meeting Water Management Challenges in the Pacific Northwest
In the hydropower-rich Pacific Northwest (approximately 70% of total regional load served), water resource agencies such as the U.S. Bureau of Reclamation (Reclamation) and the Bonneville...

Geotechnical Aspects of the Underground Excavations at the Kemano Completion Project
The Kemano Completion Project is the addition of four generators of 540 MW installed capacity to an existing eight-unit underground hydroelectric generating station owned and operated...

Sungai Piah Hydroelectric Project (Malaysia)
The Sungai Piah Hydroelectric Project is located in the State of Perak in Peninsular Malaysia. It is a run-of-river project on steep mountain streams in dense tropical jungle. Nine intakes,...

Evaluating Hydro Project Benefits with the POWRSYM Production Cost Model
The contribution that a hydro peaking project or pumped-storage project makes to reducing system operating costs can be determined only by modeling the project's operation...

Columbia River System Operation Review
For many years hydroelectric power has been a surplus commodity in the Pacific Northwest. However, this picture has been changing rapidly in recent years. Increasing pressures for use...

Outlet Works Modifications at Abiquiu Dam
For the installation of a hydroelectric project at the Corps of Engineer's Abiquiu Dam in New Mexico, outlet works modifications that would not affect the structural integrity,...

Civil Design of the Sidney A. Murray Jr. Hydroelectric Station
This paper addresses the general civil design of the Sidney A Murry Jr Hydroelectric Station with special emphasis on the design requirements of the project's unconventional...

Superplasticized Concrete for a Prefabricated Powerplant Structure
This paper describes the use of superplasticized concrete in extremely difficult placements inside a restricted access preassembled powerplant structure (PPS) of a 192 MW Sidney A Murray...

Raising of King Talal Dam
The King Talal Project is located on the Zarqa River, a Jordan River tributary, in Jordan. An existing embankment dam, 100 m high, built in the mid-seventies by the Jordan Valley Authority...

 

 

 

 