A Unique Communication System for Aerial Ropeways
The basic principles of operation of a Double Reversible Aerial Tramway are introduced. A brief note is given explaining a safety circuit or survey current used on the haul rope, since...

Safety Aspects of Detroit DPM Station Designs
The Detroit Downtown People Mover (DDPM), currently under construction in the Central Business District of downtown Detroit, offered a unique set of challenges to the architects and engineers...

Downtown People Mover System Security: Detroit and Miami Responses
The Detroit and Miami downtown people mover (DPM) systems will be in uncontrolled environments in major urban central business districts. Both plan not to have personnel on vehicles or...

Shear Stresses in Composite Masonry Walls
The behavior of composite masonry walls subjected to inplane loads is a subject that has received little attention during the last few years. The small amount of experimental and analytical...

Notes on Statistics of Failures of Constructed Works
This paper is concerned with both catastrophic and sub-catastrophic failures, which may be categorized into three types: Safety (type S), Functional (type F), and Ancillary (type A). Often...

Failure Statistics Categorized by Cause and Generic Class
Failures can be classified into the three categories, ie. , SAFETY, FUNCTIONAL, and ANCILLARY. Within the causation definition, failures fall into five general areas: DESIGN DEFICIENCIES;...

Learning from Failures
Modern technology and innovation have created a gap between what the design drawings predict with respect to safety and serviceability of a structure and the real safety and serviceability...

Project Administration
The paper discusses the vital issues involved for the efficient administration of a construction contract: effective communication, field office staffing, long lead procurement of equipment,...

Hazardous Waste Cleanup: The Preliminaries
Court-ordered negotiations rather than a trial took five years but led to a flexible plan for cleaning up an inactive hazardous waste disposal site in Niagara Falls, N.Y. Contamination...

Blind Drilling Down Under
Australia's largest blind drilled shaft is a 14 ft diameter fresh air shaft for the Agnew nickel mine 500 miles northeast of Perth. It was drilled in one pass using air-assisted...

Small Water Users�Planning Crisis
Planning to rehabilitate small water systems�both irrigation and municipal water supply�often is ignored. In contrast, planning for new construction and for operations/maintenance work...

Building Condition Assessment�An Owner's Perspective
The Port Authority of New York and New Jersey has recently instituted a program to inspect all of its buildings structures to insure structural integrity and public safety and to provide...

Damage Tolerance Assessment of Commercial Airframes
The regulatory authorities now require that commercial transport aircraft structural design be based on a damage tolerance philosophy. A brief history of the development of the regulations...

New Safety for Old Dams
Shortly after the Phase I inspection program conducted by the U.S. Army Corps of Engineers in 1978-81, the Pennsylvania legislature authorized $300 million for repair of dams, ports and...

Foam Grout Saves Tunnel
Pittsburgh's 81 year old Mt. Washington tunnel has been made safe for many more decades of light-rail transit use, with the use of foamed chemical grout. The job is the first...

The Hydroelectric Barge
The nation's inland waterway system includes many low head locks and dams, with undeveloped hydropower potential estimated in excess of 1,100 MW. For most of these dams, hydro...

Libby Rereg's Combined Spillway and Powerhouse
The existing powerhouse at Libby Dam, located near Libby, Montana has four generating units for a total of 420 MW. Provisions have been made which will allow doubling the plant rating...

Performance of Cogoti Dam Under Seismic Loading
At the time of its completion in 1938, the 280 ft (85 m) high Cogoti concrete face rockfill dam was exceeded in height by only one other dam of its type in the world, Salt Springs Dam....

New Exchequer Dam, California
New Exchequer Dam design, in 1963, was in the transition period in which dumped rockfill was being recognized as having undesirable settlement characteristics, and compaction of rockfill...

Design, Construction & Performance of Fades Dam
The project, construction and performance of les Fades dam are described. Les Fades dam is one of the first concrete faced rockfill dams compacted with a vibratory roller. A vibratory...

 

 

 

 

Return to search