Highway Safety Forum
Advancing Road Transportation Safety Through Better Communication and Cooperation Among the Disciplines
Safe travel on our streets and highways has long received ample attention. However, there remains a relatively unexplored area within this subject. This area is communication between the...
Peer Review: A Management Tool for Public Sector Projects
If done correctly, peer review can be an effective tool in managing public sector projects by reducing costs through careful weighing of design alternatives by experts in the field. The...
Water Supply Management Enters a New Era
Historical demand can no longer dictate water supply planning. The lessons learned in California are that changes in political and social attitudes require new approaches. Taxpayers are...
Assessing the Effects of Water Contamination
The threats to potable water are examined. An assessment of human ill effects of contaminated water requires a knowledge of the quality of water throughout the world and a corresponding...
If They Don't Believe You, You Need a ROCK
People misunderstand engineers because they often overlook two important factors in communication. They forget who has the power to make the decisions. They eliminate all emotional content...
Reinforcing Roof Truss Frames Under Load
Without altering the roof structure of an industrial boiler plant, a long-span steel truss frame was modified in place to support heavier loads. The owners of an industrial boiler plant...
Financial Engineering
Most firms perform design and engineering to economic criteria, as a portion of normal activities. This paper attempts to encourage further use of financial engineering by describing its...
Managing Yourself Plus One
Engineers become poor managers because they prefer devoting their time and energies to technical matters rather than those items that deal with management issues. This is true of managing...
Social and Environmental Objectives in Water Resources Planning and Management
The nation's goals for water programs and projects must be clearly understood by engineers. This report describes the process of identifying social, economic and environmental...
The Sand Dam
Currently under construction is the 443 ft. high sand fill dam. Being erodible, pervious and liquefiable, sand would normally be considered as n unsuitable material to construct LaVueltosa...
Seismic Considerations for the Century Freeway
The Century freeway (Interstate 105), will be an 18 mile (29 km) long, six-lane facility with 2 central transit/HOV lanes, located in Los Angeles, California. The freeway alignment crosses...
Seismic Risk and Decision Analysis of Lifeline Systems
This paper provides general guidelines for performing lifeline seismic risk and decision analyses. Relevant input models are introduced as they support the performance of component and...
Retrofitting Lifeline Facilities: The Japanese Approach
A brief history of the prediction of a major earthquake in the Tokai Area of Japan is reviewed. Planning and mitigation incorporating all levels of government and the private sector is...
Seismic Design of Airport Control Towers
The paper describes state-of-the-art design in seismically active areas. It includes a review of current code design parameters and specific tower design criteria. Tower design examples...
Port of Seattle Seismic Waterfront Design
This paper describes the soil seismic design process, using the design developed for a concrete apron project at Terminal 20 as an illustration. Damage by the 1965 earthquake is described....
Performance of Water and Sewer Lifelines in the May 2, 1983 Coalinga, California Earthquake
Water supply and filtration systems for the City of Coalinga suffered little damage. The water transmission system suffered five breaks. The urban distribution system was disrupted, but...
Intermountain Power Project Seismic Design
Coal-fueled generation units of the Intermountain Power Project are constructed in a seismically active area of Utah (UBC Zone 3). The seismic design criteria were published during the...
An Overview of Earthquake Design Requirements at Pacific Bell
Seismic design considerations for the telephone system including outside plant and telephone equipment are discussed with emphasis placed on the requirements incorporated in the design...
Seismic Risk and Reliability of Telecommunications Systems
A general method for seismic risk analysis of telecommunications sytems evaluates by statistical means the earthquake environment and the earthquake vulnerability and effects on the system...
Update on Impact Effects in Nuclear Plants Part I?Overview and Need for Integrated Approach
In this paper, an ASCE working group on impact effects in nuclear plants updates the review of this technology contained in a five-year-old ASCE report. In Part I, an overview is given...
Return to search