Principles of Ground Water Strategy
The states are now preparing or adopting ground water strategies under EPA direction. State and federal initiatives are currently uncoordinated, and do not add up to a coherent program....
Approaches for Protecting Groundwater From Agricultural Threats
In general, major groundwater pollutants contributed from agricultural sources are nitrate-nitrogen from chemical and animal fertilizers and pesticides applied on farm products for pest,...
Formulating a Coastal Plain Water Quality Project
In 1988, the Soil Conservation Service in Delaware helped local sponsors prepare a detailed preauthorization planning report for water quality improvement in Indian River Bay watershed,...
Managing Water Table Management Systems for Water Quality
The purpose of this paper is to briefly summarize the results of water quality studies related to water table management conducted in North Carolina over the past 15 years. Results of...
Erosion and Sedimentation Research in ARS
The paper presents a brief history of the growth of the erosion and sedimentation research program in the Agricultural Research Service of the U.S. Department of Agriculture. Subjects...
Cold Regions Engineering
This volume contains papers that were presented at the 5th International Cold Regions Engineering Specialty Conference, sponsored by ASCE and held in St. Paul, Minnesota, February 6-8,...
The Battle Over Burning
Prendergast examined the strategy of integrated solid waste management as a potential solution to the U.S. garbage crisis, in particular the role of resource recovery. This strategy, which...
Water Quality Monitoring of Highway Construction
The primary objective of water quality monitoring, as it relates to highway construction, is to obtain quantitative information to ensure that runoff from the construction site does not...
Groundwater Monitoring Network Design Using Coupled Monte Carlo Simulation and Optimization
This paper presents a method for the design, under uncertainty, of a groundwater well network for compliance monitoring at a waste disposal site. A numerical model of contaminant transport...
Application of Hydrodynamic and Water Quality Models at a Superfund Site in Montana
The water quality model applied to the site is the EPA-supported hydrodynamic and water quality model WASP4 with a modification to enable it to better simulate riverine systems. To provide...
Geostatistical Global Estimates and Sampling Design
In the environmental assessment of a contaminated site, several different evaluation criteria could be considered such as: estimation of the overall average contaminant concentration in...
Geostatistics in Estimating Chemical Residuals at a Site
Kriging with generalized covariances is used to evaluate the effectiveness of remediation and cleaning of a contaminated site. The goal is to estimate: a) the amount of total volatile...
Two-Dimensional Inter-Rill Flow Model for the Analysis of Agricultural Runoff
This paper presents a model describing the flow field for the inter-rill component of agricultural runoff. Given rainfall intensity, surface roughness, rill spacing, and longitudinal and...
Project Evaluation?Don't Miss the Boat
The hydroelectric developer is faced with many decisions during the evaluation stage. These include determining the size of the project, financial analysis to be used, type and number...
An Investigation of a Pumped Storage Hydropower System
In order to provide a realistic basis of determining the viability of a wind-powered hydroelectric system at a potential site, an evaluation technique has been developed. Basically, this...
Licensing the Moose River Hydroelectric Project
This paper describes environmental considerations in the licensing and permitting of the Moose River Hydroelectric Project, a 12.2 MW development in Central New York State. It illustrates...
EPRI's Hydro Relicensing Strategy
The most successful relicensing program is anticipated to involve an aggressive, proactive strategy as follows: select a small, responsive management team to make the decisions concerning...
Evaluation of Hydro Facilities for Sale to Another Utility
STS Hydropower had been contacted by a major industrial client near one of the STS regional offices for the purpose of evaluating both the technical and financial status of several operating...
New Martinsville Hydroelectric Project
The New Martinsville Hydroelectric Project consists of a dual bulb unit, 34 MW powerhouse constructed at an existing lock and dam navigation facility. The project was completed on budget...
Devil Canyon Powerplant Enlargement
This paper presents the design and construction aspects of the enlargement of the existing Devil Canyon Powerplant from 120 MW to 280 MW. Subjects covered include site geology, powerhouse...