Experimental Studies to Calibrate Unsaturated Flow Models
Work is described that has been designed to serve as a laboratory calibration of numerical models for unsaturated flow studies. The experiment size is configured large enough that the...
Functional Analysis: The Path to Effective Training
The regulatory requirements under which the Yucca Mountain Site Characterization Project (YMP) operates mandate that worker proficiency be achieved and maintained. Individuals performing...
Project Control?The Next Generation
The Yucca Mountain Site Characterization Project (YMP) is the U.S. Department of Energy's (DOE) second largest Major System Acquisition Project. We have developed an integrated planning...
A Computer Model for Multiplant Hydroelectric System Simulation
An interactive computer model of a multi-plant hydrothermal electric power generating system has been developed that roughly captures the main features of the British Columbia Hydro system....
Public Process in Fresno/Clovis Water Supply Plan
Groundwater is the principal reservoir for the Fresno/Clovis Metropolitan Area (FCMA) of Central California. However, significant portions of the aquifer are threatened by pesticides and...
Operating the Columbia River: A Balancing Act
Agreements to market the Canadian share of the hydroelectric power generated at U.S. facilities as a result of the Columbia River Treaty will begin terminating in 1998. Renewal of the...
Innovative Wetland Re-creation in Urban Setting
The project site is a 106 hectare, mixed-used, commercial development east of Tampa, Florida and at the westerly limit of the town of Brandon, Florida. Delaney Creek traverses the site...
Simulation of Water Quality Processes in the Chicago Waterway and Upper Illinois River Systems
The U.S. Environmental Protection Agency QUAL2E-UNCAS (QUAL2EU) computer program was used to simulate the water quality processes in the Chicago waterway and Upper Illinois River Systems....
Optimization of Operations?The Manitoba Hydro Experience
As part of a decision support system, Manitoba Hydro implemented a comprehensive optimization model for operations planning in the mid 1980's (Barritt-Flatt and Cormie 1991). Since that...
Optimal Utilization of a Multi-Reservoir Water Distribution System
A water supply distribution system planning model (DSPM) has been developed using a linear programming approach. Unlike the conventional formulation, the water demand requirements are...
Geographic Information System Application: Water Right Places of Use as Polygon Attributes
A Geographic Information System (GIS) was tested for potential use as a water resource management tool by application to a ground water study area. Because of the limitations of the particular...
GIS Reconstruction of Exposure to Water Supply Contaminants
Groundwater pollution resulting from improper waste handling practices in the aerospace industry contaminated the water supply in Tucson, Arizona. State and federal health officials concluded...
Computerized Data Processing and Geographic Information Systems Applications for Development of a 3-Dimensional Groundwater Flow Model
A 3-dimensional numerical groundwater flow model was developed for a 100 square mile area located in the Santa Clara Valley, California. The model development relied upon data base and...
The Development and Use of Policy Statements in River Simulation Models
There are a number of ways in which the physical operation of a river system can be expressed in simulation models. Most of the earlier simulation models have incorporated the operating...
The Law of the River: Policy Expression
The need to accurately represent the law of the Colorado river has heretofore precluded the use of any general purpose river basin simulation model. In order to overcome the inflexibility...
Advanced Decision Support Systems for Environmental Simulation Modeling
Some new computer approaches for integrating simulation models into water-quality management and planning are described. A system for integrating models, databases and decision-support...
Solute Transport Modeling under Unsteady Flow Regimes: An Application of the Modular Modeling System
Many existing solute transport codes rely on the assumption of steady (i.e. time-invariant) flow. This assumption severely limits such models, as accurate simulations often require realistic...
Object-oriented River System Simulation
This paper describes an object-oriented approach to river basin simulation modeling that is event driven rather than time driven as in most river system simulation models. At the heart...
RSS: A Construction Kit for Visual Programming of River Basin Models
With the ever increasing pressure on environmental resources, there exists strong interest in river basin models which can be used to simulate proposed policy alternatives. Traditionally,...
Imprecise Probability and Water Resources Decisions
In water resources engineering weak information would correspond to circumstances when the record is extremely short relative to the mean rate of occurrence of important design events,...
Return to search