Using Project Management Techniques in Hydro-Relicensing
To answer a pressing need for managing today's complex process and requirements of hydro relicensing, Central Maine Power Company (CMP) has applied the principles of project management,...

Extensive Civil Penalties Apply?Lessons Learned Since Waterpower '89
Section 12 of ECPA authorized the FERC to assess civil penalties in enforcing Part I of the Federal Power Act and its implementing regulations, as well as the terms and conditions of hydropower...

Private Hydropower Projects: Exporting the American Experience
This paper addresses different aspects of exporting the American knowledge and experience in the private development of small-scale hydropower projects. It details the 'export'...

Technology Transfer for Small Hydro
The wide range of different definitions of what constitutes a small hydroelectric power plants is discussed and the conclusion is drawn that this definition should be based more on the...

Hand Held Powerhouse Control Console or Portable Data Terminal
The Portable Data Terminal (PDT) is a very small light weight hand held computer terminal that communicates with the control system computer by radio. An operator monitors power plant...

A Hydroelectric Plant Operator's Assistant
This paper describes a PC based application designed to assist in the process of enhancing the performance of multi-unit hydroprojects. Optimization considerations, uses of the Operator's...

Examples of Risk Assessment in Dam Safety Decision Making
Three examples of risk-based dam safety evaluations performed for dam users or operators are summarized. These studies were conducted by major U.S. engineering firms and involved experienced...

Rehabilitation of the Dams at the Crescent and Vischer Ferry Hydroelectric Projects
This paper reviews the dam rehabilitation design and construction techniques used at the New York Power Authority's Crescent and Vischer Ferry Dams. The following are the...

Civil Design of the Sidney A. Murray Jr. Hydroelectric Station
This paper addresses the general civil design of the Sidney A Murry Jr Hydroelectric Station with special emphasis on the design requirements of the project's unconventional...

Evaluating History?The Edison Sault Powerhouse
The hydroelectric facility owned by the Edison Sault Electric Company at Sault Ste Marie, Michigan was an engineering marvel when it was designed and constructed. This paper explores the...

Pressure-Time Method Using Modern Practices
Over the past twenty years, Hydro-Quebec has modernized the pressure-time method of flow measurement, a method which is generally economical but sometimes difficult to apply. Starting...

UCD Drag Plate Lysimeter?Momentum and Mass Transfers
The second large (6.1 m dia., 0.97 m deep) lysimeter built at the University of California, Davis (UCD) was largely the brainchild of Dr. F.A. Brooks, the initial Project leader of a U.S....

Transpiration by Douglas Fir Using Lysimeters
During the spring of 1971 a 28 m Douglas fir tree was installed in a weighing lysimeter. Some details of construction are presented. The weighing mechanism consisted of eleven lengths...

Estimation of Loading via Fingered Flow
Results of experimental investigations of fingered preferential flow are combined into a concise, conservative engineering methodology for predicting pollutant transport through fingered...

The Ala Wai Canal?From Wetlands to World-Famous Waikiki
The Ala Wai Canal, a man-made tidal estuary on the island of Oahu, Hawaii, is located about a half mile (0.8 km) landward of Waikiki beach and is two miles (3.2 km) long. As Hawaii's...

SRFR?A Model of Surface Irrigation?Version 20
The computer program, SRFR, comprises a mathematical model of flow in furrows, basins, and borders. It is designed for systematic, repeated application in the solution of design and management...

Tidal Flooding Analysis, San Francisco Bay
Many leveed areas adjacent to San Francisco Bay are potentially subject to tidal flooding. In response to this concern, Congress authorized the U.S. Army Corps of Engineers to conduct...

Winds, and Their Effects on Tides, in San Francisco Bay
Many leveed areas adjacent to San Francisco Bay are potentially subject to tidal flooding. In response to this concern, Congress authorized the U.S. Army Corps of Engineers to conduct...

Optimizing Regional Detention Basins for Price Expressway
Stormwater runoff from the drainage area contributing to the Price-Santan Freeway is captured in regional detention basins which require a series of pump stations for evacuation. With...

Bridge Scour Vulnerability Assessment
Although the failure of the New York Throughway bridge over Schoharie Creek in 1987 has focused national attention on scour related failures, other failures reinforce the need for implementing...

 

 

 

 

Return to search