Dam Safety Hydrologic and Seismic Evaluation of TVA'S Beech Dam
Beech Dam is part of the Beech River watershed resource development located in Decatur and Henderson counties in west Tennessee. The development consists of eight dams and approximately...

Foundation Investigations of Concrete Dams
This paper discusses a series of foundation investigations conducted on concrete dams by Pacific Gas and Electric Company. The paper focuses on investigative techniques, equipment, appropriate...

Rocky Mountain Project Power Tunnel Filling Test
The Rocky Mountain Project, a pumped storage development located in NW Georgia, is owned jointly by Oglethorpe Power Corporation and Georgia Power Company. Initial construction included...

Seismic Analysis of the Bonneville 1st Powerhouse
The Bonneville 1st powerhouse monoliths were constructed during the period of 1938 to 1942 and were designed against seismic loads using the old lateral coefficient method. The Corps of...

Concrete Gravity Dam Cracking Analysis Methodology
This paper describes a methodology for the prediction and evaluation of cracking behavior in concrete gravity dam's for use in periodic safety investigations as outlined in...

Cone Penetration Testing: Cost Effective Soil Exploration
On reviewing the 1987 Part 12 Dam Safety Inspection Reports for the Wisconsin River Power Company's Petenwell and Castle Rock Dams, the Federal Energy Regulatory Commission...

Field Tests of a Lewiston Pump-Generating Unit
An extensive field test program was undertaken on a Lewiston Pump-Generating Plant (LPGP) unit at the Niagara Power Project, owned and operated by the New York Power Authority. The objective...

Evaluation of Turbine Intake Velocity Criteria
The paper addresses the effect of intake flow distribution on turbine performance at low-head projects. Field and model test data are used to raise the question of whether typical turbine...

Laboratory and Field Experience with Cavitation Monitoring of Hydroturbines
When control of cavitation erosion can be accomplished by changes in operating conditions, real-time monitoring of cavitation level is a valuable tool. Three types of cavitation monitors...

Waterpower 91?Laboratory Investigation of Syphon Intakes
The Federal Department of Energy, Mines and Resources (Canada) has funded four separate investigations of syphon hydro technology. These study phases, which were carried out by Acres Hydraulic...

Diagnostic Testing and Repair of Grand Rapids Generating Station's Unit Four
This paper is a case history that discusses diagnosis and correction of a variable pitch propeller type (Kaplan) hydraulic turbine problem. The turbine problem involved fatigue failures...

Case Study in the Upgrade and Rehabilitation Techniques of a Pumped Storage Installation
This paper presents a specific case study in the runner upgrade and unit rehabilitation of two pump/turbines at the Seneca Powerhouse. The study addresses the modern optimized designs...

Direct Load Cell-Based Weighing Lysimeter System
A low-cost weighing lysimeter system is described which is capable of measuring evapotranspiration with an accuracy of 0.05-0.10 mm. A two-lysimeter system with electronic data logger...

Field Experience with Hydraulic Weighing Lysimeters
Hydraulic weighing lysimeters can be a reliable and relatively inexpensive source of actual crop evapotranspiration (ET) data for field water use studies and crop coefficient development....

Australian Lysimeter Studies of Field Evaporation
Evaporation data are summarised from separate lysimeter installations involving forest, crops and pastures along the 35?S parallel in south-eastern Australia. In each study, lysimeter...

Relationship Between Lysimeter Area and Evapotranspiration (ET)
The lysimeter is an important instrument for measuring evapotranspiration (ET) of crops. It is widely used in the irrigation and drainage experimental stations in China. However, the areas...

Overview and Objectives of the Macrodispersion Experiment
TVA is conducting large-scale field experiments to better define movement and dispersion of contaminants in groundwater. This will support groundwater protection by making possible more...

Second Natural-Gradient Tracer Experiment
The Tennessee Valley Authority (TVA) has begun a second large-scale groundwater field experiment at the Columbus Groundwater Research test site in Mississippi. This research is a continuation...

Practical Technology Resulting from MADE Research
As is often the case, when theoretical research is performed, practical technology is developed in the process. This has occurred with the Macrodispersion Experiment (MADE) conducted at...

Prematurely Terminated Slug Tests?A Field Application
Slug tests suffer problems of non-uniqueness to a greater extent than other well tests. Alternatively, a prematurely terminated slug test (PTST) or a systematized drillstem test is proposed,...

 

 

 

 