Geotechnical Considerations in the Design of the Wando Terminal Wharf Extension, Charleston, South Carolina
The South Carolina State Ports Authority (SPA) is currently examining construction concepts for the proposed 1,200-foot wharf extension and 40 acres of adjacent upland development at the...
Port of Kismayo (Somalia) Rehabilitation
Extensive deterioration of the 2070 ft long four-berth, marginal wharf at the Port of Kismayo necessitated a major rehabilitation to maintain operations. The selected scheme was a steel...
Construction Materials for Civil Engineering Projects
The materials of construction in use today have grown in number, increased in complexity, expanded in application and multiplied in utilization over those in use just a short time ago....
Salvaging the Zilwaukee
In 1982, construction of the Zilwaukee Bridge in Michigan was disrupted when the launching truss failed to hold a precast concrete segment near Pier 11N, severely deflecting the cantilever...
The Mile High Dream
For the 1986 Tall Buildings Conference in Chicago, a group of experts studied the implications of a mile high skyscraper to be built of concrete. It is 500 ft square at the base, designed...
Asphalt Pavement Modifiers
Modifiers or additives to asphalt concrete pavements are being researched or marketed by many major chemical firms. Modifiers or additives are used to stiffen the asphalt in hot weather...
Expert Systems Enter the Marketplace
Civil engineering expert systems (computer programs that incorporate some of the decision-making capabilities of the top experts in a given subdiscipline) are beginning to come on the...
Pressuremeter and Foundation Design
The design of shallow and deep foundations on the basis of pressuremeter results is analyzed using numerous load tests and case histories. The foundations are shallow footings subjected...
Reliability of Pile Capacity Assessment by CPT in Overconsolidated Clay
Correlations for unit skin friction and end bearing are established between cone penetration test (CPT) records, triaxial data and a small data base of measured skin friction and end bearing...
Predictions of Pile Shaft Capacity With the PLS Cell
In situ measurements of stresses and pore pressures on a model pile shaft, the Piezo-Lateral Stress (PLS) cell, are utilized to reconstruct the conditions of load tests involving two large...
Dilatometer Tests for the Design of Grouted Piles in Rock
A case study of drilled and grouted piles in rock, which were analyzed using results of down-hole dilatometer tests is presented. The tests were performed from a jack-up platform in water...
In Situ Tests Aid Design of a Cylinder Pile Wall
In situ testing was used to verify geotechnical design parameters and modify construction for a 22 million dollar slope stabilization project near a major highway interchange. The project...
The DMT - ?hc Method for Piles Driven in Clay
This paper presents a tentative method for evaluating the limiting skin friction f//s for piles driven in clay based on sigma //h'c (horizontal effective stress at the interface...
Design Parameters for Grouted Piles in Rock From In-Situ Load Tests
A series of pile load tests were performed at an onshore site to develop final geotechnical parameters for the Gaviota platform foundation which consists of large diameter drilled and...
Skin Friction Evaluated From Friction Meter Test
This paper first describes the features of a specially developed friction meter and its operation method, and then reports in-situ test results conducted on various types of soils at two...
Uplist Capacity of Pile Foundations Using CPT Data
Southern California Edison Company has performed field uplift load tests on concrete driven piles, cast-in-place straight shaft piles and cast-in-place belled piers along transmission...
N-Values Used to Predict Settlements of Piles in Egypt
A method is proposed for using the standard penetration N-values to predict the load-settlement curves for different piles used in Egyptian soils. The method is based on H. G. Poulos-E....
The Pressuremeter for Foundations: French Experience
The paper presents historical information on the development of the pressuremeter and its application in the Laboratories Central des Ponts el Chaussees (LCPC). The continuous research...
Tunnel Ceiling Replaced over traffic
The ceiling of the Holland Tunnel under the Hudson River, connecting New Jersey and Manhattan, was 59 years old and needed replacement, a big job because there are 3 miles of ceiling in...
Aerated Static Pile Composting of Wastewater Sludge: A Field Study in Longmont, Colorado
This is a report of experimental work at the Longmont wastewater plant at Colorado, on aerated static pile composting of wastewater sludge. 61% of the sludge mass used in compost piles...