What Do Project Managers (need to) Know About CADD?
Computer Aided Design and Drafting (CADD) is here to stay. Today's project managers are being challenged to master the use of CADD on their projects. CADD often can 'make or break' a project....
Pavement Treatment in Ohio Transportation System
This paper presents a modification of the original method in which the concept of fuzzy set theory is applied in the calculation of the PCR. Fuzzy numbers are introduced to represent those...
Integrating Computer Application for Pavement Management: A Case Study
This paper presents a case study of the process through which a relational database management system and stand-alone application programs are developed and integrated to form a comprehensive...
A Version and Configuration Scheme for Collaborative Engineering
This paper presents a data management model for collaborative design. Versions are proposed to support the independent evolution of design alternatives in an individual discipline. configurations...
Database Integration in Support of Construction Management
This presentation will describe how new object-oriented technology is being applied to this problem. The goal of this use of object-oriented systems is 1) to provide a method for processing...
A Computerized Methodology for Conducting Pedestrian Gap Studies
this paper will detail recent improvements with the procedure the New York City Department of Transportation utilizes when conducting Pedestrian Gap Studies. These improvements were made...
Facilitate Delay Claim Analysis with As-Built Schedule Databases
A computer-based As-Built Schedule Database can provide a useful tool for the investigation of project performance. The facts recorded in the database may be used to identify actual sequential...
The Use of SCADA for Real-time Calculation and Monitoring for CT Compliance at the Ralph D. Bollman Water Treatment Plant
The contra Costa Water District (CCWD) of Concord, CA was formed in 1935 under the authority of the State Water Code. CCWD purchases its water supply from the Central Valley Project (CVP),...
Contemporaneous Development of Field Data: Transportation Construction Claim Defense
This paper addresses the continuing development of a construction field database system documenting resources applied on the jobsite by Contractors. The paper focuses on the case study...
Computer Use in Claims Analysis -- Roundtable Discussion
Preparation or defense of construction claims is inherently time consuming and often counter-productive. This outline discusses some tools currently used in the construction industry to...
Practical Approach to Cope with Construction Cost Uncertainty in an Inflationary Environment
There are actions suggested to mitigate the risk in costs caused by an inflationary economy, such as escalation clauses and including price contingencies in the bid . This paper presents...
Management Information System Application on a Multi-Million Overseas Project
Project Management Information Systems (PMIS) provides improved data quality, consistency, timeliness, and reporting flexibility and improved project teamwork. Project managers have a...
A Knowledge-Based Computer System for Financial Wind Risk Management
This paper presents the results of a sponsored applied research project conducted by a multi-disciplinary team to integrate state-of-the-art methods in wind and collateral (e.g., surge,...
The Integrated Systems Approach to Facilities Management
This paper investigates the condition and use of the systems for facilities management and discusses process and considerations for improving the long term value of integrated facilities...
Displacement of Landmark Building Resulting from Adjacent Construction Activities
This paper describes the observations and presents comments related to the measurement of settlement and the avoidance of damage to a historic structure in the City of New York from adjacent...
Settlement Evaluation for Cap Closure Performance
Predicting short and long-term performance of a landfill cap system is a difficult task considering the generally unknown nature of the waste and magnitude and variation of settlement...
Modeling Settlements of an Existing Municipal Solid Waste Landfill Sideslope Using an Earthen Surcharge Pile
This paper discusses the results of a large-scale field compressibility test completed on municipal solid waste (MSW). The test consisted of surcharging the waste mass with an earthen...
The Role of Shale Pores in Settlement
Waste fills resulting from the mining of coal in Appalachia should ideally consist of large, free-draining sedimentary rock fragments. The successful performance of these embankments is...
Vibration Induced Settlement From Blast Densification and Pile Driving
This paper describes settlement and vibration environments produced by two construction activities, blast densification and pile driving. Blasting is of interest because of the significant...
Federal Risk Management Policy: Where Are the Problems?
Federal risk management policy involves both risk assessment and risk management elements. Risk assessment consists of hazard identification, dose-response assessment, exposure assessment,...