Decision Rules for Reservoir Releases
One of the problems faced with computer modeling of a multi-reservoir, hydro-power system is making decisions on how releases will be made. Reservoirs many times have multiple demands...
Development of a New Hydraulic Design Tool for Spiral Casing/Distributor Geometry
A novel computational model has been developed to predict highly complex turbulent flow in a combined spiral casing/distributor geometry. Validation of the computational model against...
Optimal Real-Time Control of Hydroelectric Power Plant Using Dynamic Programming
In this paper, an approach of optimal real-time control of hydroelectric power plant operations is presented. The methodology is based on a dynamic programming technique where the original...
Hand Held Powerhouse Control Console or Portable Data Terminal
The Portable Data Terminal (PDT) is a very small light weight hand held computer terminal that communicates with the control system computer by radio. An operator monitors power plant...
A Hydroelectric Plant Operator's Assistant
This paper describes a PC based application designed to assist in the process of enhancing the performance of multi-unit hydroprojects. Optimization considerations, uses of the Operator's...
Ferroresonance & the Snettisham Hydroelectric Project
Key system features of the Snettisham power plant in Alaska will be highlighted along with a discussion of the operational problems encountered due to a ferroresonant condition. The project...
Voltage Regulator Influence on Generator System Stability
During initial startup of a generator system, it is not uncommon to witness generator voltage instability. Most of the time, the solution is reduced to returning the stability control...
Validation Studies on Indexed Sequential Modeling for the Colorado River Basin
A method called indexed sequential modeling (ISM) has been developed by the Western Area Power Administration to estimate reliable levels of project dependable power capacity (PDC) and...
Operation of Hydropower Plants Considering Daily Streamflows
Operation of hydropower plants is a sequential decision process often modeled as a dynamic programming problem. Typically, such formulations consider monthly stages assuming that monthly...
Consideration of Sedimentation on Hydropower Projects
Experience gained by analysis of a number of hydropower projects throughout the world leads to the conclusion that it is necessary to consider sediment related aspects in the design and...
Hydraulic Design and Development of Propeller Replacement Runner for R. H. Saunders
This paper outlines the hydraulic design for the R.H. Saunders replacement runner. The six-bladed propeller runner was numerically optimized based on 3-dimensional flow simulation. After...
New Demands for Hydro Unit Inspection and Preventive Maintenance
As the hydro industry enters the 90's, special interest has been drawn to the fundamental practice of hydro unit inspection and maintenance. New demands on hydropower equipment...
Operations and Maintenance Manual for Bradley Lake Hydroelectric Project
Bradley Lake Hydroelectric Project is located on the Kenai Peninsula of Alaska. The project consists of two 63 MVA turbine-generators fed via a single 3.5-mile-long penstock. The water...
Total Quality Planning
When it comes to major unit maintenance, 'total quality results' require an investment in 'total quality planning.' The successful replacement...
Probabilistic Scheduling of Cavitation Repairs
The probabilistic nature of maintenance scheduling is exemplified by operating histories and conditions which vary from unit to unit. Typically, an operator must decide whether to repair...
R. H. Saunders GS?Propeller Turbine Runner Replacement Project Outline and Model Development
Ontario Hydro's operating philosophy is to operate all of its facilities in an optimum manner. The basic rationale for upgrading this plant is to maximize its energy potential...
Dillon Hydroelectric Project Performance Versus Expectations
The Dillon Hydroelectric Project was commissioned in 1987. Design and construction are briefly described; plant availability is compared with design expectations; and maintenance costs...
On-Site Rehabilitation Capabilities for the Nineties
This paper will review recent technological advancements in on-site manufacturing and machining capabilities which have been developed for the proper installation of new hydro turbines....
Decision Support for Colorado River Operations
The United States Bureau of Reclamation (Reclamation) uses a simulation model known as the 24-month Study Model for planning monthly and seasonal operations for the Colorado River Basin....
Pressure-Time Method Using Modern Practices
Over the past twenty years, Hydro-Quebec has modernized the pressure-time method of flow measurement, a method which is generally economical but sometimes difficult to apply. Starting...