Design and Construction of Waterfront Facilities at U.S. Navy Homeport at Ingleside, Texas
The waterfront facilities for the largest of the Navy's new homeports in the Gulf of Mexico were completed in 1990. The project included over 2,500 feet (762 m.) of deep draft bulkhead...

West Point Temporary Construction Dock
The West Point temporary construction dock is designed to provide construction access for the West Point treatment plant project located in Seattle, Washington. The dock plays a major...

Recycled Materials for Port Construction
The concept of utilizing recycled materials is presented. Types of materials which may be applicable are described, as well as, typical projects utilizing these materials....

Terminal Asphalt Patching: An Innovative Approach
Asphaltic concrete has dominated the terminal industry as the pavement of choice for years. It is readily available and economical to install but requires considerable maintenance expense....

Historic Seawalls of the Boston Harbor, Massachusetts Region: Evolution, Construction and Repair
The earliest seawalls in the Boston region were of crib construction. Cobb cribs had an open framework and could readily be floated into position and sunk with rock from local sources....

Water Demand Management in the Las Vegas Valley Region
Water resources in the Las Vegas Valley Region (LVR) are of great concern to the residents and local water purveyors. The chief stimulus for concern is the rapid growth of the region coupled...

Predicting Water Demand in Agricultural Regions Using Time Series Forecasts of Reference Crop Evapotranspiration
Overall, it can be said that the time series model developed in this study did provide superior forecasting results for the Brawley, CA, site. This indicates that the monthly reference...

Agricultural Option Contracts
A plan for developing and implementing option contracts on agricultural water supplies by municipalities in Northern Colorado is presented. Two water supply projects - the Colorado-Big...

Computer-Aided Support for Water Quality Modeling of the Russian River
A computer-aided support system for operation of the QUAL2E-UNCAS modeling packaged has been developed for modeling of the Russian River, California. The system has been created under...

Highway Construction and a Trout Stream Relocation
In 1970, a ten-mile section of Traffic Route 15 in the northern portion of Lycoming County extending into Tioga County was under design as a two-lane limited access highway on four lane...

Optimal Capacity Expansion in Multi-Aquifer Systems
A deterministic optimization model is presented for analyzing the capacity expansion policies in multi aquifer systems. The response of the system is included in the optimization model...

Implementation of the NPDES Storm Water Regulations by Municipalities in the San Francisco Bay Area
The U.S. Environmental Protection Agency's (EPA's) final rule for storm water discharge regulation under the National Pollutant Discharge Elimination System (NPDES) requires municipalities...

Management of Portland's Combined Sewer System
The City of Portland, Oregon, has embarked upon a two-year program to develop a long-term management program for its combined sewer system. A team of consultants is assisting the City...

A Multi-objective Criteria Analysis for Alternative Route Planning
A multi-objective criteria analysis was used to identify a proposed rail spur route with the optimal combination of low environmental impact, favorable engineering characteristics and...

Rural-Urban Water Transfers in Nevada: Solution or Problem?
Nevada is the most arid of the 50 states, yet is one of the fastest growing in terms of population. With this population growth, primarily in its two largest population centers, Las Vegas...

Trickle Channel Rehabilitation
Perhaps the primary factor driving the need for trickle channels is urban development. Rural streams in the region display a hydraulic stability and vegetative cover that is resilient...

Building a Pipeline?Not a Flow Through Process
This paper will illustrate that the planning, design, and construction of a 32-mile water supply pipeline from Stockton Lake to Springfield involves more than just digging a trench, placing...

Environmental Management Issues in Developing Countries of Southeast Asia
Acknowledging the escalating concerns regarding the environmental impact of water resource projects, a serious effort must be made to identify and review environmental issues which directly...

The Total System Solution
Most pipeline reconstruction programs carried out to date have been crisis driven or reactive instead of system wide approaches to problem solving. Two tools have been devised to change...

CSO Rehabilitation Strategies for Urban Areas
The USEPA national strategy for reduction of combined sewer overflows places high priority on maximizing the amount of combined wastewater that is captured and treated in the existing...

 

 

 

 