Rehabilitation of Cracked Embankment Dams
Cracking is a common phenomenon in many earth embankment dams and especially those small to medium size dams constructed on compressible soil foundations. Collapsible soil conditions,...

Mud Mountain Dam Concrete Cutoff Wall
Mud Mountain Dam is an earth and rockfill flood control dam on the White River. The dam is located approximately 50 km southeast of Seattle, Washington. The dam was constructed in 1941...

Landslide Stabilisation at the Clyde Power Project, New Zealand
The Clyde Power Project is a hydro electric development on the Clutha River in the South Island of New Zealand. A wide range of stabilization measures have been used to treat several large...

The Stabilization of Concrete Dams by Post-Tensioned Rock Anchorages: The State of American Practice
Permanent post-tensioned rock anchorages have been used for over twenty years in America to stabilize existing concrete dams and their appurtenant structures. This paper provides a state...

Bond Stress Test on Rock Anchor in Clayey Siltstone
Seventy five rock anchors with design loads of 556 to 2040 kips were required for the 1000-foot long, 125-foot high, concrete gravity, Lake Lynn Dam to comply with current FERC engineering...

Rehabilitation of Crescent and Vischer Ferry Dams?Construction Techniques & Problem Solutions
This paper reviews some of the problems encountered during the rehabilitation of the Crescent & Vischer Ferry Dams and the techniques used to comply with strict water level regulations...

Improving Seismic Safety of Dams in California
A search of the dam files at California's Division of Safety of Dams has revealed that at least 94 dams have been improved for seismic stability. The results of the search are tabulated...

Seismic Rehabilitation of Echo Lake Dam
Echo Lake Dam is an existing dam raising a natural lake in the Sierra Nevada in California, along the western edge of the Tahoe Basin. The dam was an embankment built with steep, hand...

Liquefaction Potential of Gravelly Soils in Dams
Gravelly soils are common components of embankment dams and their foundations. When such soils have been placed or deposited in a loose condition and are saturated, they are potentially...

Liquefaction Evaluation by Seismic Potential Procedure
Empirical procedures in common use for liquefaction evaluation employ information from a variety of sources in order to evaluate whether or not a site will undergo liquefaction. The information...

Reduction of Liquefaction Potential by Compaction Grouting at Pinopolis West Dam, SC
A previous 1984 field study and subsequently published paper (Salley et.al., 1987) described the seismic design background and evaluated the potential success of compaction grouting to...

Prestwood Lake Dam Rehabilitation
The Prestwood Lake Dam located in Hartsville, South Carolina is owned by Sonoco Products Co. It originally was a wood structure built in 1895. That structure was washed out by a hurricane...

Improving Dam Safety Using a Fin Drain
Bloemhoek Dam is an embankment dam with a maximum height of 21 m, which leaked severely after first filling in 1978. This leakage resulted in the development of `boils' over a portion...

Graham Lake Dam Remedial Measures Project
Graham Lake Dam consists of a 550-foot long earth embankment and an 80-foot long concrete spillway. Several concerns were identified during project inspections including limited spillway...

Certified Safety Assessment of Zoccolo Dam
The paper reports one of the activities carried out in the framework of a so called `certified assessment of safety' program activated by ENEL SpA - Italian National Electric Board - in...

Testing and Evaluation of High Capacity, Multi-Strand Rock Anchors for Lake Lynn Dam
Seventy five rock anchors with design loads of 556 to 2040 kips were required for the 1000-foot long, 125-foot high, concrete gravity, Lake Lynn Dam to comply with current FERC engineering...

Twin Lakes Enlargement and Rehabilitation
The Twin Lakes Enlargement and Rehabilitation Project involves an enlarged embankment replacing a two-tiered reservoir system with a single, larger-volume reservoir and new appurtenances....

The Douglas Dam Emergency Response and Rehabilitation
Through the timely response of the Owner, the potential failure of Douglas Dam was averted, and lives and property downstream were protected. The economic losses created by loss of irrigation...

Bureau of Reclamation Experience with Innovative Solutions to Increased Design Floods
Over the last several decades advances in the hydrologist's ability to estimate floods have resulted in increases to the design floods for many existing drainages. As with other dams throughout...

Remedial Grouting at Calero Dam
This paper describes the design and construction of a remedial grout curtain to resolve a long-standing seepage condition at Calero Dam, located at the south end of the highly-populated...

 

 

 

 