Prefab Power
The Love Hydroelectric Generating Station, owned by the city of Vanceburg, Ohio, was prefabricated in France complete with all components, brought across the Atlantic and towed to Greenup...

Flood Control
The Hamilton and Riemer reservoirs were constructed by excavating pits below grade to receive flood overflows from adjacent streams. The two reservoirs are part of a 52 sq. mile (135 km�)...

Nonlinear Analysis of Reactor Vessel & Core Supports Subjected to Accidental Impact Loads
Nonlinear dynamic analyses of the reactor vessel, its support systems, the core and the core supports were performed to evaluate the consequences of such drops. Damage was defined in terms...

Modeling Techniques for Seismic Analysis of Supported Systems
An automated seismic qualification process is presented which integrates the modeling and evaluation aspects of supported system design. Emphasis is placed on baseplate and joint design....

Development of Concrete Nuclear Containment (ACI 359) Code Requirements as they Relate to Probability Based Load
The historical development of the load combinations used in concrete containment is presented in the paper. These load combinations are examined and identified in the light of the reasonable,...

Bayesian Procedure for Evaluation of Containment Capability
The functional requirements of a steel or concrete containment is to maintain the structural integrity as well as the leak-tight integrity of its pressure boundary under specified design...

Containment Capability
Section 2. 0 of this report contains a description of analysis methods for the containment structure. Testing on containment models and sections of containments is described. Section 3....

An Estimate and Evaluation of Design Error Effects on Nuclear Power Plant Design Adequacy
An estimate by the author is found of typical error levels contained in Structural-Mechanical-Civil Design and Stress Reports. Based on the original analysis performed to demonstrate design...

Update on Impact Effects in Nuclear Plants Part II?Review of Pipe Whip Impact
Current regulations require that pipe breaks be postulated in high-energy lines and measures be taken to prevent consequent damage to essential structures and systems. The paper addressed...

Computer-Automated Limit-States-Design of Steel Frameworks
The paper concerns the computer-automated synthesis of minimum-weight planar steel frameworks. For any number of applied loading cases, the design of the structure may be constrained by...

Grouting Rehabs Earth Dam
To accommodate increased storage needs the Pennsylvania Power & Light Company had to reactivate a fly ash basin and raise an adjacent embankment dam. However, seepage through the...

Hydraulic Uncertainty in Risk Analysis
Considerable effort has been expended in defining and evaluating hydrologic uncertainties; however, the analysis and evaluation of hydraulic uncertainties has received little attention....

Risk Analysis in Dam Safety Programs
There are about 68,000 dams in the Nation. About 95 percent of the dams are nonfederal; the balance are owned by various agencies of the federal government. Over 30 percent of the high...

Scour and Fill Monitoring at Lock and Dam No. 26 (Replacement), Mississippi River
Information gathered during construction of the first stage dam is presented. The information consists of data indicating flows and stages along with data obtained from surveys which monitor...

RCC Dam Incorporates Innovative Hydraulic Features
An overview of the features of Monksville Dam is presented, with emphasis on the hydraulic components of the project. This 150-foot (45-meter) high roller compacted concrete structure...

Upper Hudson River Valley Dam Break Model
In order to determine areas of inundation due to the failure of Conklingville Dam, a dam break analysis was performed, and the resulting outflow hydrograph was routed through the downstream...

Hydrotest Rupture of Penstuck Liner at Bath County
Bath County is the construction site of Virginia Electric and Power Company's pumped storage project. Rupture of a penstock liner during hydrotest at high pressure threatened...

Instruments Detect Dam Movement During Construction
Recent attention has been given to retrofitting electrical generation facilities at existing dams. Maintaining a safe structure during construction, and accomplishing this within a budget...

Willow Creek Dam--To Be or Not To Be
In Heppner, Oregon, several alternatives for flood control were considered. A concrete gravity dam constructed using roller compaction methods was selected because of the greatly reduced...

Operation of Glen Canyon Dam Spillways--Summer 1983
Flood control at Glen Canyon Dam is provided by a 41-ft (12. 5-m) diameter tunnel spillway in each abutment. Each spillway is designed to pass 138,000 ft**3/sec (3907. 7 m**3/sec). The...

 

 

 

 