Spray and Ice Measurement Instrumentation for Ships
Bow slamming is the primary water delivery mechanism for ship superstructure icing. Spray flux is largely dependent upon hull dynamics, and cannot be computed numerically with current...
New Support for Pin-Hanger Bridges
To promote safety of their bridges, many state highway departments are considering ways to add auxiliary support to existing pin-hanger bridges. The Pennsylvania DOT and its open-end consultant...
Privatization Takes Flight
The number of air travelers in the U.S. is projected to double by early in the next century. Delays have also been mounting rapidly. Major airports around the world are facing the same...
Precipitator Retrofit and Repair: A Case Study
Described is a difficult fossil power station retrofit project performed on a tight schedule at a congested site. Installation of a new supplementary precipitator and structural repairs...
Improved Corrosion Protection for Flue Gas Systems Utilizing a Dual Liner Concept
A unique system of corrosion resistant materials has shown excellent performance and durability in flue gas systems for fossil plants, cogeneration plants, waste incinerators and waste-to-energy...
Properties and Environmental Impact of Stabilized Fly Ash
This paper summarizes the results of two research studies aimed at evaluating the properties and possible environmental effects of bituminous and lignite coal based fly ashes stabilized...
Stabilized Fly Ash Cover for a Municipal Waste Landfill
The study reported herein and several recently related projects have been aimed at reducing the hydraulic conductivity of fly ash and physiochemically fixing any potential leachable metals....
Environmental Aspects and Compliance Costs of Hydropower Regulation
Recent experiences by American Electric Power with respect to mitigation at hydroelectric project sites on the upper Ohio River indicate that compliance with environmental regulations...
Dam, Spillway and Hydropower Rehabilitation
Many older dams are in need of rehabilitation as a result of aging, deterioration, and more stringent safety standards. Current deficiencies include deterioration of original construction...
Advanced Composites Materials in Civil Engineering Structures
This proceedings of the Specialty Conference on Advanced Composites Materials in Civil Engineering held in Las Vegas on January 31?February 1, 1991 contains 40 papers from ten technical...
Cold Regions Engineering
This proceedings consists of papers presented at the Cold Regions Engineering Specialty Conference held in West Lebanon, New Hampshire from February 26-28, 1991. The papers cover nine...
A Computerized Completion
The original designers of the 1.6 million sq ft Fillmore Center in San Francisco (its largest mixed-use development project in 20 years) had specified a large amount of steel reinforcement...
Building Beneath Boston
Up/down construction is a method in which a project's substructure and superstructure are simultaneously built. The substructure's wall, column and foundation...
Fixing Foundations
Conventional underpinning or pilings are still the most common construction methods used to strengthen foundations, but new grouting techniques are giving engineers some fresh alternatives....
Making the New Look Old
Between March 1990 and January 1991, Annapolis buried overhead utilities and reconstructed the roadway around the historic State House, built in 1769. The paving stones, colonial-appearing...
Jailhouse Design
According to statistics from national corrections groups, the inmate population in the U.S. has reached 1 million and could double by 1995. With the constant need for more beds, engineers...
Development of the ASME/NUPACK Code
A Committee has been active for 10 years to develop Code rules for the design, construction and in-service requirements of containment systems for nuclear spent fuel and high level radioactive...
Design Considerations for the Yucca Mountain Project Site Characterization
The Site Characterization Facilities (SCF) to be located in volcanic tuff at Yucca Mountain is a challenge to manage, design, and construct. This challenge is a result of a number of factors....
Application of QA Grading to Yucca Mountain Site Characterization Project Items and Activities
Grading is the act of selecting the quality assurance (QA) measures necessary to develop and maintain confidence in the quality of an item or activity. The list of QA measures from which...
High-Level Waste Disposal Regulations: Time for a Change?
Major developments since EPA's high-level radioactive waste disposal regulations were promulgated challenge the validity of some of the assumptions underlying these regulations....
Return to search