Crab and Salmon Habitat Enhancement in Grays Harbor Estuary, Washington
A description of mitigation for crab losses and reduced salmonid habitat, expected to occur during construction of the Grays Harbor, Washington, Navigation Improvement Project, is presented....

Coastline Management: A Challenge for Developing Countries
Coastal erosion has been a worldwide problem of primary concern to coastal management and development. To arrest the coastal erosion processes along the coastline of developing countries...

Onsite Compliance Programs for Major Oil and Gas Projects
Major oil and gas projects developed in Santa Barbara County are monitored for compliance with conditions of approval through various enforcement and compliance programs. the Resource...

Effective Mitigation of Air Emissions from OCS Sources
Unmitigated, platforms and associated facilities in the OCS typically emit large quantities of air pollution from power generation, drilling, transportation and other activities related...

Design Guidance for Nearshore Berm Construction
Construction of nearshore berms has been gaining acceptance as a cost effective beneficial use of dredged material. This paper presents a systematic methodology for design and evaluation...

Topographic Responses to the Construction of Large Port Structures on Oarai Coast
Large offshore breakwater and groins have been constructed at Oarai Port, Japan. As a result, the coast experienced significant topographic changes. In this paper, the responses of the...

Planning Subsurface Storage-Transport Facilities for Combined Sewer Overflow Control in Cincinnati, Ohio
The wastewater collection system in the greater Cincinnati area includes a large area served by a combined sewer system. The combined sewer system drains to the Ohio River and several...

Construction Management at Sikes Superfund Site
Lockwood, Andrews & Newnam, Inc. (LAN) is providing Construction Management services on the Sikes Superfund site. The project involves constructing an incinerator on-site and incinerating...

Noise Control Program for the Boston Harbor Project
A noise control engineering program has been instituted for the Boston Harbor project to make the facility virtually inaudible at the property line. The program integrates the noise mitigation...

High Level Radioactive Waste Management 1991
The proceedings of the second annual international conference on High Level Radioactive Waste Management, held on April 28 - May 3, 1991, Las Vegas, Nevada, provides information on the...

Unit Pricing and Unbalanced Bids
Unit price contracts were meant to provide a simple and equitable way to pay contractors. However, to offset the uncertainties inherent in construction, contractors unbalance bid items....

Setting Standards in San Diego
Most engineering firms have developed specifications and standards that become the bible for project-related design issues�and no two firms are the same. On complex, large-scale projects...

Pumped Storage Promise
With many utilities facing potential shortfalls in generating capacity, pumped storage hydro plants could be a key to meeting peak-period energy demand in the 1990s. Pumped storage plants...

When FERC Investigates Your Unlicensed Project: A Five-Point Protection Plan
A FERC investigation into a project's jurisdictional status poses the potential for substantial risks and costs. This paper outlines a 'five-point protection...

Dealing with the Difficult Utility
The experience of an independent hydroelectric power developer, STS HydroPower, Ltd. (STS), involved in the full scope of hydroelectric activities is desribed. The purpose of the paper...

Small and Low Head Pumped Storage Projects
With the recent completion of several very large pumped storage projects, the perception of a hydroelectric pumped storage project in some power industry circles may be that of a project...

The PEC Headworks Project?A Cooperative Hydropower Development
The PEC Headworks Project is a single-unit hydroelectric facility located at the headworks of the Potholes East Canal at O'Sullivan Dam on the Potholes reservoir near Moses...

Lake Siskiyou Power Project
The Lake Siskiyou Power Project was constructed at the foot of the existing Box Canyon Dam on the Sacramento River in Northern California. Major project features included the construction...

Geotechnical Aspects of the Underground Excavations at the Kemano Completion Project
The Kemano Completion Project is the addition of four generators of 540 MW installed capacity to an existing eight-unit underground hydroelectric generating station owned and operated...

Soil Nails as Temporary Powerhouse Support
Newcastle Powerhouse was constructed as an underground structure with its top deck at the finished ground surface. The powerhouse is three-quarter circular and one-quarter square in plan....

 

 

 

 

Return to search