Effect of Wind on Coastal Construction in Florida
The State of Florida's tidal shoreline is 8,426 miles long. Both the east and the west coast of Florida is subjected to several coastal storms each year. The present study...

Ocean Mining with Shoreline Protection
This paper describes an existing construction system that permits building large concrete structures directly on the water in low-cost floating formwork with unskilled local labor operating...

A Conflict Avoidance Methodology for Port Dredging Issues
Port dredging operations have often been the focus of controversy over environmental and funding disputes. This paper asserts that adversarial relationships among interested parties will...

Crab and Salmon Habitat Enhancement in Grays Harbor Estuary, Washington
A description of mitigation for crab losses and reduced salmonid habitat, expected to occur during construction of the Grays Harbor, Washington, Navigation Improvement Project, is presented....

Reactivation of the Oil and Hazardous Materials Simulated Environmental Test Tank (OHMSETT) Facility
The Oil and Hazardous Materials Simulated Environmental Test Tank (OHMSETT) was run by the Environmental Protection Agency (EPA) from 1974 to 1988. This open-air tank was used to test...

Coastline Management: A Challenge for Developing Countries
Coastal erosion has been a worldwide problem of primary concern to coastal management and development. To arrest the coastal erosion processes along the coastline of developing countries...

Onsite Compliance Programs for Major Oil and Gas Projects
Major oil and gas projects developed in Santa Barbara County are monitored for compliance with conditions of approval through various enforcement and compliance programs. the Resource...

Effective Mitigation of Air Emissions from OCS Sources
Unmitigated, platforms and associated facilities in the OCS typically emit large quantities of air pollution from power generation, drilling, transportation and other activities related...

Design Guidance for Nearshore Berm Construction
Construction of nearshore berms has been gaining acceptance as a cost effective beneficial use of dredged material. This paper presents a systematic methodology for design and evaluation...

Topographic Responses to the Construction of Large Port Structures on Oarai Coast
Large offshore breakwater and groins have been constructed at Oarai Port, Japan. As a result, the coast experienced significant topographic changes. In this paper, the responses of the...

Construction Management at Sikes Superfund Site
Lockwood, Andrews & Newnam, Inc. (LAN) is providing Construction Management services on the Sikes Superfund site. The project involves constructing an incinerator on-site and incinerating...

Noise Control Program for the Boston Harbor Project
A noise control engineering program has been instituted for the Boston Harbor project to make the facility virtually inaudible at the property line. The program integrates the noise mitigation...

High Level Radioactive Waste Management 1991
The proceedings of the second annual international conference on High Level Radioactive Waste Management, held on April 28 - May 3, 1991, Las Vegas, Nevada, provides information on the...

Unit Pricing and Unbalanced Bids
Unit price contracts were meant to provide a simple and equitable way to pay contractors. However, to offset the uncertainties inherent in construction, contractors unbalance bid items....

Setting Standards in San Diego
Most engineering firms have developed specifications and standards that become the bible for project-related design issues�and no two firms are the same. On complex, large-scale projects...

Portland's New Approach to Maintenance
The traditional if it ain't broke don't fix it approach to maintenance was not working for Portland, Oregon's two wastewater treatment plants. By...

Pumped Storage Promise
With many utilities facing potential shortfalls in generating capacity, pumped storage hydro plants could be a key to meeting peak-period energy demand in the 1990s. Pumped storage plants...

When FERC Investigates Your Unlicensed Project: A Five-Point Protection Plan
A FERC investigation into a project's jurisdictional status poses the potential for substantial risks and costs. This paper outlines a 'five-point protection...

Dealing with the Difficult Utility
The experience of an independent hydroelectric power developer, STS HydroPower, Ltd. (STS), involved in the full scope of hydroelectric activities is desribed. The purpose of the paper...

Small and Low Head Pumped Storage Projects
With the recent completion of several very large pumped storage projects, the perception of a hydroelectric pumped storage project in some power industry circles may be that of a project...

 

 

 

 

Return to search