Materials and Manufacturing Processes
This chapter introduces the basic materials used in the manufacturing of composite structures. It will help the line designer in understanding how the different elements of the fiber-matrix...

Performance-Based Criteria for FRP Products and Materials
In most ways, fiber-reinforced polymer (FRP) structures perform similar to wood and steel structures. There are, however, certain differences and these differences are described in this...

Superior Court
For a sport obsessed with getting a round ball through a hoop, the shape of the new Naismith Memorial Basketball Hall of Fame seems entirely appropriate. The building is intersected by...

Evaluation of the Tricon Retained Soil Wall System
Prepared by the Highway Innovative Technology Evaluation Center, a CERF/IIEC Innovation Center. This report describes a HITEC evaluation designed to...

Evaluation of the Maccaferri Terramesh System Retaining Wall
Prepared by the Highway Innovative Technology Evaluation Center (HITEC), a CERF/IIEC Innovation Center. This report describes a HITEC evaluation designed...

Crossing the Yangtze
The Nanjing Second Yangtze River Bridge, which links two parts of the city of Nanjing, features the first use of an epoxy asphalt deck pavement in China and one of the longest cable-stayed...

Preserving Pisa's Treasure
Pisa's bell tower, a prime example of Romanesque architecture, would be renowned even if it did not lean. Construction of the tower began in 1173 and was not completed until...

Berm Breakwaters?Design, Construction and Monitoring
The philosophy of the fieldwork of Berm breakwaters was applied in Iceland. A few case histories were described with emphasis on quarry investigations, design, construction and monitoring....

Design and Construction of the Pier J Breakwaters at the Port of Long Beach, California
Several different alternatives to mitigate surge activity were investigated. The most acceptable solution was a pair of new breakwaters that altered the basin geometry to change the basin...

Construction Factors and Monitoring Methods Relating to the Performance of Ventura Breakwater Core Loc Repair
In 1999 the Los Angeles District of the U.S. Army Corps of Engineers (USACE) repaired the north Ventura breakwater head. The head was rebuilt using 2-ton underlayer stone armored with...

St. George Habor?Berm Breakwater Construction Considerations
During the period 1984-1987 three berm breakwaters with a total length of approximately 800 meters were constructed at St. George Harbor on St. George Island in the Pribil of Chain of...

Strength from Within
After decades of being continuously struck by rockfalls and wayward vehicles, Knapps Hill Tunnel�a highway structure built in 1936 and located on state Route 97A in central Washington...

An Arbor for Art
The new $50-million, 153,000 sq ft (14,200 m�) building for the Modern Art Museum of Fort Worth will provide the museum with more than five times its current gallery space. The design...

Big Idea
The reconstruction of the Big I�the intersection of interstate routes 25 and 40 in Albuquerque that was named for its appearance from the sky�was likely to disrupt commuters and interstate...

Multifaceted Trenchless Rehabilitation at the Middletown, Ohio WWTP
This paper describes the multiple trenchless technologies that were evaluated and the ones that were applied to the rehabilitation of a 78la diameter corrugated metal influent line and...

Economic Restoration of Concrete Infrastructure at Jefferson Parish, Louisiana
United States municipalities are spending hundreds of millions of dollars annually tore place and repair corroded concrete infrastructures in wastewater systems. Structures such as wet...

Penn State's Graduate Option in Watershed Stewardship
A Graduate Option in Watershed Stewardship has been created at Penn State with the objective of educating water resources students to implement team-oriented, interdisciplinary problem...

An Innovative Stormwater Management Project in Sydney, Australia
Presented in this proposed paper will be derails of a project implemented in Sydney, Australia aimed at addressing this need for information regarding the implementation and effectiveness...

Tamarack Managed Groundwater Recharge Project
A managed groundwater recharge project was begun in the Fall 1996 at the Tamarack Ranch State Wildlife Area (SWA) owned by the Colorado Division of Wildlife near Crook in northeast Colorado....

A Glass Act
The Museum of Glass under construction in Tacoma, Washington, is the centerpiece of a plan to develop brownfield sites on the Thea Foss Waterway. The $57.3-million museum project includes...

 

 

 

 

Return to search