Construction Factors and Monitoring Methods Relating to the Performance of Ventura Breakwater Core Loc Repair
by Bradd Schwichtenberg, USACE Jacksonville District, 400 West Bay Street, Jacksonville, FL 32232-0019,William Halczak, USACE Los Angeles District, 911 Wilshire Blvd, 12071 Los Angeles, CA 90017-3401,
Rick Lainhart, USACE Los Angeles District, 1284 East 7th Street, Rear Trailer, Upland, CA 91786,
Document Type: Proceeding Paper
Part of: Breakwaters '99: First International Symposium on Monitoring of Breakwaters
Abstract:
In 1999 the Los Angeles District of the U.S. Army Corps of Engineers (USACE) repaired the north Ventura breakwater head. The head was rebuilt using 2-ton underlayer stone armored with 20-ton Core Loc units. This paper reviews basic design requirements and construction elements employed to achieve the repair. Available post construction monitoring techniques are discussed.
Subject Headings: Offshore construction | Construction methods | Coastal protection structures | Construction equipment | Breakwaters | Rocks | Offshore structures | California | United States | Los Angeles
Services: Buy this book/Buy this article
Return to search