Geological Processes and Conservation Management Strategies for Barrier Islands of the Virginia Coast Reserve
A barrier island is a sandy deposit that is located immediately offshore and parallels a mainland coast. It is the principal environment of six interactive environments that make up the...

Multiple Owned Coasts: Development & Access
A fifteen mile stretch of coast near the Virginia-North Carolina border is currently undergoing a dilemma associated with development and public access. This region offers an excellent...

The Impact of the I-664 Bridge-Tunnel Crossing on Sedimentation
A sedimentation evaluation was made of the proposed I-664 Bridge-Tunnel complex across the James River, Virginia. This paper briefly describes the procedures used and the results obtained...

A Methodology for Forecasting APM Operation and Maintenance Trends Using Existing Experience
Operation and Maintenance responsibility for the Morgantown, West Virginia Automated People Mover (APM) was assumed by West Virginia University some nine years ago. The experience of the...

The WMATA Resident Engineer?The Team He Leads and His Responsibilities
This paper discusses the role of the Resident Engineer as a key member of any construction team. It uses the organization and functions as practiced at the Washington Metropolitan Area...

Microcomputer Software Support at the State Level
This paper describes a case where the organizational approach to microcomputer control was taken and contrasts the results with optimal individual systems within the group. In this context,...

A Microcomputer-Based Safety Management System
An agency's effectiveness in undertaking its highway safety responsibilities is most critically dependent upon the information available and the means provided to access and...

Micro-Computer Rucus?A User's View
In 1973, Centro, a medium-sized transit company, contracted with the firm Ken Roberts & Associates (KRA) to implement a RUCUS package for the Syracuse area. The package was originally...

Open Water Disposal for Marsh Creation James River, VA
There is a need for close cooperation between design and construction of levees on soft foundation for containing dredge material. The scope of this study included marine exploration,...

Impacts of an Overboard Disposal Operation
The objective of this study was to establish an acceptable dredge disposal site which would be physically and environmentally suitable for periodic use over the 50-year project life of...

Dredged Material Disposal Modeling - Chesapeake Bay
A plan to deepen the approach channels to Baltimore Harbor from 42 feet to 50 feet involves in part the overboard disposal of about 9. 5 million cubic yards of dredged material in the...

An Offshore Mound Constructed of Dredged Material
The concept of using dredged material to intentionally construct an underwater mound was tested and confirmed at the Dam Neck Disposal Site, 4 miles offshore Virginia Beach, Virginia....

Hydrotest Rupture of Penstuck Liner at Bath County
Bath County is the construction site of Virginia Electric and Power Company's pumped storage project. Rupture of a penstock liner during hydrotest at high pressure threatened...

A Quantitative Assessment of Surface Water Resources for Coal Slurry Pipelines Originating in Southwest Virginia
In view of the high streamflow variability, preliminary quantitative assessment was made of the capacity requirements and low-flow frequency characteristics of offstream reservoirs needed...

West Virginia Cooling Tower Collapse Caused by Premature Form Removal
The collapse of a reinforced concrete cooling tower under construction at Willow Island, W.Va. in April 1978 resulted in 51 fatalities, making it the worst construction accident in American...

 

 

 

 