Civil Engineering in the Oceans V
This proceedings is a collection of technical papers presented at Civil Engineering in the Oceans V (CEO V) specialty conference held at College Station, Texas on November 2-5, 1992. Initiated...

Management of Comments on DOE's Site Characterization Plan (SCP) and Integration with the Planned Geotechnical Program
The U.S. Department of Energy (DOE) has committed to respond to comments on the SCP throughout the site characterization process. As of January 1990 DOE has received 4,574 comments on...

Are We Ready to Face the Geotechnical Challenges of the 21st Century?
The geotechnical engineering profession faces a bright future as many of the issues of interest to society today relate in some form to knowledge of earth sciences. Hazardous waste, environmental...

Hypermedia and its Application to Geotechnical Databases
The concept of hypermedia has the potential for greatly enhancing existing database management software. In the present paper the concept of hypermedia is briefly described, the nature...

Geotechnical Database Management Systems for Boston's Central Artery/Harbor Tunnel Project
This paper presents a geotechnical computer application currently in use on Boston's Central Artery/Harbor Tunnel (CA/T) Project. The application is designed to manage subsurface...

Relational Database Design and Technology
Logical and physical design of a Relational Database Management System (RDBMS) is presented with a simple geotechnical database example. Fundamental relational database design principles...

Automated Performance Monitoring of U.S. Dams
The purpose of this paper is to provide a summary of a comprehensive report prepared by USCOLD on General Guidelines and Current U.S. Practice in Automated Performance Monitoring of Dams....

Pressuremeter Stress Relaxation Testing in a Permafrost Tunnel
In the spring of 1988, a geotechnical testing program was carried out in the U.S. Army CRREL Permafrost Tunnel, located at Fox, near Fairbanks, Alaska. In all, some thirty cone penetrometer...

Expert System for Driven Pile Selection
Selection of driven piles for deep foundations is a complex process. Many subjective factors enter into the decision of which pile to select, making experience an important factor in proper...

Jet Grouting?Uses for Soil Improvement
The frequency of use of any engineering technique depends mainly on the technical feasibility and economics of the system. In geotechnical engineering, the more problems a construction...

An Expert System for Civil Engineering Applications
Civil engineering is a field where experimental knowledge has no substitute. Making experts' knowledge explicit and documenting and transferring it can have a great impact...

Evaluation of Geotechnical Design Parameters by Expert System Techniques
This study refers to application of an artificial intelligence technique to evaluate geotechnical design parameters in the soil design definition. This complex evaluation is incorporeted...

Geotechnical Engineering Design in the Age of the Modern Computer
Because geotechnical engineering requires that the materials and their configuration be investigated for each new project, the profession has always placed great emphasis on judgment....

Computer Applications in the UCB Geotechnical Laboratories
The use of personal computers has become an indivisible part of the University of California at Berkeley (UCB) geotechnical testing laboratories. The University has been on the forefront...

Use of a Tie-Back Retaining Wall to Stabilize a Moving Landslide
After failure of a gravity retaining wall, a moving landslide was stopped and stabilized by a tie-back retaining wall. The design considered the active landslide and residual strength...

Data Base of Seismic Body Wave Velocities and Geotechnical Properties
A data base of seismic velocities measured in soils and standard geotechnical engineering material properties has been established at the U.S. Army Engineer Waterways Experiment Station...

Geotechnical Failure of Revetments
A calculation method is developed to analyse the stability of a granular subsoil underneath a revetment under wave attack. This method leads to a minimum revetment weight per square meter...

Who Pays for the Unexpected in Construction: The Geotechnical Contractor's Point of View
Unexpected conditions are inherent in most construction projects and often lead to claims and legal action. Contract risk avoidance language force owners, engineers and contractors to...

Geotechnical and Construction Aspects of the Immersed Tube Tunnel in Boston Harbor
An immersed tube tunnel (ITT) approximately 3,850 feet in length will be constructed as a part of the Central Artery/Tunnel Interstate Highway Project located in Boston, Massachusetts....

Geotechnical Engineering Congress?1991
This proceedings, Geotechnical Engineering Congress 1991, consists of papers presented at the Geotechnical Congress held in Boulder, Colorado...

 

 

 

 

Return to search