Great Hall
One of the most provocative structures gracing the London landscape, the new City Hall, at More London, is also a world-class model of energy-efficient design....

Enduring Strength
The long-term effectiveness of posttensioning in bridges depends on the resiliency of the tendons, and various factors related to construction and marine environments come into play. How...

Grand Finale
For 87 years Oklahoma's state capitol remained unfinished, the majestic cast-in-place concrete dome its designers envisioned never built. But as Oklahoma approached its centennial�to...

Failures and Problems with Lift-Slab Construction
This chapter provides an overview of failures and problems with lift-slab construction. Topics include jack systems with inadequate take-up devices; the Canadian wedge connection; Serra...

Initial Considerations
The purpose of this section is to aid the line designers in developing their specifications for fiber-reinforced polymer (FRP) materials utilized in electric overhead line structures....

Materials and Manufacturing Processes
This chapter introduces the basic materials used in the manufacturing of composite structures. It will help the line designer in understanding how the different elements of the fiber-matrix...

Design Loads
This chapter discusses the types of loadings that should be considered when designing overhead power lines utilizing fiber-reinforced polymer (FRP) poles. For infrastructure applications...

Performance-Based Criteria for FRP Products and Materials
In most ways, fiber-reinforced polymer (FRP) structures perform similar to wood and steel structures. There are, however, certain differences and these differences are described in this...

Suggested Guidelines for Performance-Based Tests
Although several standard tests are cited in this chapter, these tests are not designed specifically for fiber-reinforced polymer (FRP) overhead line structures. There are, in fact, no...

Quality Assurance
The user is responsible for ensuring the quality of products purchased. Therefore, the user of fiber-reinforced polymer (FRP) products determines the level of quality that will be accepted....

Assembly and Erection
This chapter is intended to provide recommendations on transporting, handling, assembling, and erecting fiber-reinforced polymer (FRP) poles. An important consideration is that FRP poles...

In-Service Considerations
Generally, little or no preventative maintenance is required on fiber-reinforced polymer (FRP) poles. This chapter discusses factors that could affect the performance of FRP poles after...

Evaluation of the Geo-Con Vert Wall System
Prepared by the Highway Innovative Technology Evaluation Center (HITEC), a CERF/IIEC Innovation Center This report describes a HITEC evaluation designed...

Structure as Art
The structural engineering to support the architecture of a free-form, Frank Gehry-designed building is never easy, but the engineers for a new university building devised several innovative...

Evaluation of the Inter-Lok Retaining Wall System
Prepared by the Highway Innovative Technology Evaluation Center (HITEC), a CERF/IIEC Innovation Center. This report describes a HITEC evaluation designed...

Breakwaters '99
First International Symposium on Monitoring of Breakwaters
The papers present state-of-art methods and technologies that are used in the structural and environmental monitoring of rubble mound breakwaters. Structural monitoring concerns the structural...

Evaluation of the Tricon Retained Soil Wall System
Prepared by the Highway Innovative Technology Evaluation Center, a CERF/IIEC Innovation Center. This report describes a HITEC evaluation designed to...

Recent Advances in Optimal Structural Design
Sponsored by the Technical Committee on Structural Design of the Technical Administrative Committee on Analysis and Computation of the Technical Activities Division of the Structural Engineering...

Evaluation of the Maccaferri Terramesh System Retaining Wall
Prepared by the Highway Innovative Technology Evaluation Center (HITEC), a CERF/IIEC Innovation Center. This report describes a HITEC evaluation designed...

A Dam for a Dam
The General Electric (GE) Dam in Minneapolis, Minnesota, was more than a century old when it began leaking excessively in December 1998. Operations staff for the dam owner�the Minneapolis-based...

 

 

 

 

Return to search