Rehabilitation of Cracked Embankment Dams
Cracking is a common phenomenon in many earth embankment dams and especially those small to medium size dams constructed on compressible soil foundations. Collapsible soil conditions,...
Improving Seismic Safety of Dams in California
A search of the dam files at California's Division of Safety of Dams has revealed that at least 94 dams have been improved for seismic stability. The results of the search are tabulated...
Seismic Rehabilitation of Echo Lake Dam
Echo Lake Dam is an existing dam raising a natural lake in the Sierra Nevada in California, along the western edge of the Tahoe Basin. The dam was an embankment built with steep, hand...
Liquefaction Potential of Gravelly Soils in Dams
Gravelly soils are common components of embankment dams and their foundations. When such soils have been placed or deposited in a loose condition and are saturated, they are potentially...
Liquefaction Evaluation by Seismic Potential Procedure
Empirical procedures in common use for liquefaction evaluation employ information from a variety of sources in order to evaluate whether or not a site will undergo liquefaction. The information...
Reduction of Liquefaction Potential by Compaction Grouting at Pinopolis West Dam, SC
A previous 1984 field study and subsequently published paper (Salley et.al., 1987) described the seismic design background and evaluated the potential success of compaction grouting to...
Prestwood Lake Dam Rehabilitation
The Prestwood Lake Dam located in Hartsville, South Carolina is owned by Sonoco Products Co. It originally was a wood structure built in 1895. That structure was washed out by a hurricane...
Improving Dam Safety Using a Fin Drain
Bloemhoek Dam is an embankment dam with a maximum height of 21 m, which leaked severely after first filling in 1978. This leakage resulted in the development of `boils' over a portion...
Graham Lake Dam Remedial Measures Project
Graham Lake Dam consists of a 550-foot long earth embankment and an 80-foot long concrete spillway. Several concerns were identified during project inspections including limited spillway...
Certified Safety Assessment of Zoccolo Dam
The paper reports one of the activities carried out in the framework of a so called `certified assessment of safety' program activated by ENEL SpA - Italian National Electric Board - in...
Twin Lakes Enlargement and Rehabilitation
The Twin Lakes Enlargement and Rehabilitation Project involves an enlarged embankment replacing a two-tiered reservoir system with a single, larger-volume reservoir and new appurtenances....
The Douglas Dam Emergency Response and Rehabilitation
Through the timely response of the Owner, the potential failure of Douglas Dam was averted, and lives and property downstream were protected. The economic losses created by loss of irrigation...
Bureau of Reclamation Experience with Innovative Solutions to Increased Design Floods
Over the last several decades advances in the hydrologist's ability to estimate floods have resulted in increases to the design floods for many existing drainages. As with other dams throughout...
Remedial Grouting at Calero Dam
This paper describes the design and construction of a remedial grout curtain to resolve a long-standing seepage condition at Calero Dam, located at the south end of the highly-populated...
Ultrafine Cement Tests and Drilling Warm Springs Dam
Ultrafine cement was chosen by the Corps of Engineers for tertiary grouting the Warm Springs Dam because of its ultrafine particle size, low settlement, medium viscosity and longevity....
Geotechnical Modifications at Meeks Cabin Dam
This paper presents a summary of the geologic and geotechnical evaluation of a potential piping deficiency identified at Meeks Cabin Dam as well as description of remedial measures and/or...
General Design and Construction Considerations for Remedial Seepage Control
All earth and rock-fill dams are subject to seepage through the embankment, foundation and abutments. Methods for remedial seepage control include storage restriction, grouting, upstream...
The Use of Post-Tensioned Anchorages on the Arch Portion of Stewart Mountain Dam, Arizona
Post-tensioned rock anchorages were selected by the Bureau of Reclamation (Reclamation) to stabilize Stewart Mountain Dam against potential seismic loadings. The use of such anchorages...
A Review of Drilling and Grouting Methods for Existing Embankment Dams
With the increasing emphasis being placed on dam rehabilitation and repair, more dam engineers are faced with the need to interface with drilling and grouting specialists. Regretfully,...
Remedial Design and Construction to Improve a Sliding Embankment
The paper describes the studies made to identify the nature of possible remedial measures such as improved drainage, removal of the weak clay layer or a provision of a buttressed dam....
Return to search