Rebuilding America
Infrastructure Rehabilitation
The future of the nation demands a solution to the problem of our deteriorating infrastructure. Civil engineers are called on to act as guardians of our public works facilities that must...

The National Ground Water Information Center Data Base
The Research Institute, Education Foundation and Publishing Company of the National Water Well Association have long been considered information central for the world's community of hydrogeologists....

Integrated Design Methodology for Urban Stormwater Detention Facilities
The objective of this paper is to present the core of a design methodology that avoids the pitfalls of the design storm concept by using a microcomputer algorithm to estimate the long-term...

Building Assessment Techniques for Indoor Air Quality Evaluations
Techniques for indoor air quality evaluations are presented and discussed. The techniques presented first focus on procedures to determine effective ventilation rates and pathways of air...

Design and Construction of TCE/PCE Removal Facilities
This paper presents a review of the design and construction of a facility in Arcadia, California, to remove trichloroethylene (TCE) and tetrachlorethylene (PCE) from ground water. (Edited...

Design of a GAC Water Treatment System for Radon
The author describes the design of a granular activated carbon (GAC) treatment system for the removal of radon from a public water supply....

The Engineering Aesthetics of Tall Buildings
The Proceedings of a session on the Aesthetics and Design of High-Rise Buildings at the ASCE Convention in Denver is included in its entirety. The session was chaired by Lynn Beedle and...

Achieving a Truly Accessible Urban Waterfront
In some states or regions public access to the shoreline can be mandated through a Commission created by Legislation, as in the San Francisco Bay. This situation, however, is not the norm....

Funding for Shore Protection: New Jersey's Approach
The history of shore protection funding in New Jersey is rather bleak. From 1959 to 1980, a total of 56,810,080 was spent on beach restoration. Of that total, 27,084,768 came from the...

Hurricane Diana: Impact on Coastal Development
Hurricane Diana affected the coast of North Carolina during the period of September 11-14, 1984. Builders, designers, building officials and insurance adjusters responded to a written...

Get Involved with Cladding Design
Structural engineers should get involved with cladding design for their buildings. Including disclaimers for responsibility in the design contract will not prevent trouble or lawsuits,...

The Tunnel That Transformed Philadelphia
The 1985 Outstanding Civil Engineering Achievement is the Center City Commuter Rail Connection, a 1.7 mile tunnel connecting two former stub-end railroad stations in Philadelphia. The...

Tapping Deep Water Resources
Lena is the first commercial guyed tower. Its jacket is the longest ever fabricated, loaded out and launched in one piece. Lena stands in 1,000 ft deep water and has a three-level oil...

Longitudinal Prestressed Piping for District Heating
The design of recently installed hot water district heating systems in the United States is based on similar systems developed in Europe. Longitudinal prestressing is used in the design...

Comparing Flood Stage-Discharge Data?Be Careful!
A long term stage-discharge record is extremely valuable data. However, simplified applications of long term records to draw sweeping conclusions about man's effects should be avoided,...

3-D Orthogonal Curvilinear Circulation Modelling
A three-dimensional circulation model has been developed using an orthogonal curvilinear coordinate system. The model as constructed is capable of simulations on a variety of time and...

Microprocessor-Based Data Acquisition Systems
The application of microprocessor-based data acquisition systems to laboratory experiments and field tests is discussed. The importance of the system design and hardware selection is emphasized....

Changing Attitudes Towards Elevated Structures
This paper examines the reaction of professionals and politicians to specific examples of proposals for new public transport systems that entail elevated structures in central areas. When...

The Planning of an Automated Rapid Transit System in Vancouver
BC Transit is building a 13 mile (22 km) rapid transit line in Vancouver that incorporates Heavy Rapid Transit, Light Rapid Transit and Automated People Mover concepts. The bus sized lightweight...

Emerging Technology?A Solution to Airport Access Problems
This paper reviews airports which presently have employed people movers, the problems they are solving, and potential use for solving access problems and create added value for the investment...

 

 

 

 

Return to search