Site Selection and Building Design for Minimizing Vibration
Over the last five to ten years, line resolutions required for state-of-the-art semi-conductor wafers have dropped to well below 1 micron. As a result, controlling environmental building...

Soil Nailing Supports Excavation
Excavation for the PPG Headquarters complex in Pittsburgh, Pa. was critical because the site is adjacent to three historically important buildings. Soil nailing, a method of in situ earth...

Behavior and Strength of Stub-Girder Floor Systems
The paper presents a detailed evaluation of the behavior and strength characteristics of the stub-girder floor system. This is a composite girder and beam structure that integrates the...

Building on Muck
The Craney Island Disposal Area at Norfolk, Va. is a 2,500 acre depository for material dredged from ports and channels in the Hampton Roads. The U.S. Army Corps of Engineers extended...

Quality in the Constructed Project
The purpose of the workshop summarized in this book was to develop an agenda for ASCE actions to promote quality in the constructed project. The papers, discussions and session reports...

Rebuilding America
Infrastructure Rehabilitation
The future of the nation demands a solution to the problem of our deteriorating infrastructure. Civil engineers are called on to act as guardians of our public works facilities that must...

The National Ground Water Information Center Data Base
The Research Institute, Education Foundation and Publishing Company of the National Water Well Association have long been considered information central for the world's community of hydrogeologists....

Integrated Design Methodology for Urban Stormwater Detention Facilities
The objective of this paper is to present the core of a design methodology that avoids the pitfalls of the design storm concept by using a microcomputer algorithm to estimate the long-term...

Building Assessment Techniques for Indoor Air Quality Evaluations
Techniques for indoor air quality evaluations are presented and discussed. The techniques presented first focus on procedures to determine effective ventilation rates and pathways of air...

Design and Construction of TCE/PCE Removal Facilities
This paper presents a review of the design and construction of a facility in Arcadia, California, to remove trichloroethylene (TCE) and tetrachlorethylene (PCE) from ground water. (Edited...

Design of a GAC Water Treatment System for Radon
The author describes the design of a granular activated carbon (GAC) treatment system for the removal of radon from a public water supply....

The Engineering Aesthetics of Tall Buildings
The Proceedings of a session on the Aesthetics and Design of High-Rise Buildings at the ASCE Convention in Denver is included in its entirety. The session was chaired by Lynn Beedle and...

Achieving a Truly Accessible Urban Waterfront
In some states or regions public access to the shoreline can be mandated through a Commission created by Legislation, as in the San Francisco Bay. This situation, however, is not the norm....

Funding for Shore Protection: New Jersey's Approach
The history of shore protection funding in New Jersey is rather bleak. From 1959 to 1980, a total of 56,810,080 was spent on beach restoration. Of that total, 27,084,768 came from the...

Hurricane Diana: Impact on Coastal Development
Hurricane Diana affected the coast of North Carolina during the period of September 11-14, 1984. Builders, designers, building officials and insurance adjusters responded to a written...

Get Involved with Cladding Design
Structural engineers should get involved with cladding design for their buildings. Including disclaimers for responsibility in the design contract will not prevent trouble or lawsuits,...

The Tunnel That Transformed Philadelphia
The 1985 Outstanding Civil Engineering Achievement is the Center City Commuter Rail Connection, a 1.7 mile tunnel connecting two former stub-end railroad stations in Philadelphia. The...

Tapping Deep Water Resources
Lena is the first commercial guyed tower. Its jacket is the longest ever fabricated, loaded out and launched in one piece. Lena stands in 1,000 ft deep water and has a three-level oil...

Longitudinal Prestressed Piping for District Heating
The design of recently installed hot water district heating systems in the United States is based on similar systems developed in Europe. Longitudinal prestressing is used in the design...

Comparing Flood Stage-Discharge Data?Be Careful!
A long term stage-discharge record is extremely valuable data. However, simplified applications of long term records to draw sweeping conclusions about man's effects should be avoided,...

 

 

 

 

Return to search