The Charles River Project
The Charles River Project received the 1984 Presidential Award for Design Excellence in Architecture, Engineering, and Urban Planning. Sited between Charlestown and Boston's...

Solving Complex Urban Design Problems
Waterfront redevelopment projects under construction today should be a designer's dream. They offer an opportunity to apply a unified, large-scale vision to unusually large...

The River Walks of San Antonio Move to Providence
At the historic heart of Providence, Rhode Island, three rivers divide the city into three areas. Nearly one mile of river corridors have been abused over the last century, resulting in...

Reflections on Racine's Rebound
The existing harbor in Racine has approximately 110 acres of water surface bounded on the north and south side by one-half -mile long concrete breakwaters and on the west by the city....

Techniques for Rapid Assessment of Seismic Vulnerability
Under the impetus of a growing awareness of seismic hazards, there is an increasing effort being devoted to assessing the seismic vulnerability of existing buildings. For many professionals...

Evaluation and Upgrading of Wood Structures
Case Studies
The need to evaluate and upgrade existing wood structures stems from concerns of safety and serviceability. These concerns are caused for a variety of reasons which include plans for continued...

The Rise of the Tall Building
The development of the high-rise frame in the U.S. was the result of a collision of many factors. The destruction of Chicago in the great fire of 1871 was one major factor in the start...

Designing for Shock Resistance
If a product or structure is subject to shock loadings, and is unable to take them without unacceptable damage, it must be insulated from the shock. The decision may be to redesign the...

Isolating Earthquakes
The Foothills Communities Law and Justice Center in Rancho Cucamonga, Calif., is the first U.S. building to rest on base isolators for protection against a possible earthquake of 8.3 Richter....

Designing for High Technology Use
Four papers are presented detailing factors and/or case studies on high technology facilities. The authors represent different points of view. An owner discusses the three phases of the...

Meeting the Infrastructure Challenge of the 1980's
The future of the nation demands a solution to critical infrastructure problem. The public works facilities must be maintained, restored, and added to. The condition of these facilities...

The State's Prospects for Infrastructure Rehabilitation
In November 1982, at Governor Spellman's initiative, Washington State became one of six states participating in the National Infrastructure Analysis, sponsored by the Joint...

Who is Managing the Rebuilding of our Infrastructure
Determining the nationwide infrastructure needs and identifying the organizations responsible for this assessment are complex processes. Yet, if this nation is to have an organized, orderly...

Deep Water Bering Sea Development Concepts
A brief description of the major environmental factors that a structure used to produce oil and gas in the deep water Bering Sea would have to cope with is presented. In particular, the...

Multi-Truss Design for Tower
A modified structural steel system of outrigger trusses and belt trusses bolster the 54-story Equitable Tower West. Located in New York City, the building's structural system...

Management Secrets of Top Consultants
Leaders of five consulting civil engineering firms, which are considered among the best managed, discuss management strategies. In all cases, carefully selected personnel is considered...

Structural Considerations for a Radwaste Facility
The structural engineer needs to consider several criteria when designing a radioactive-waste processing facility in order to properly balance the requirements of safety and economy. This...

Seismic Pope Support Construction Practices
During the mid 1970's the regulatory agencies controlling the design and construction of nuclear power plants began to demand stricter adherence to already existing codes...

The Prudency Management Audit: A New Challenge for the Civil Engineer
The Nuclear Industry, particularly utilities and their constructor, engineering and vendor agents, is faced with a surging increase in Prudency Management Audits. Such Audits are often...

Civil Engineering Challenge with Nuclear Waste
The planning, design and construction of the ground surface facilities for a nuclear waste repository involves civil engineering in many ways. The transportation of heavy, metal shielded...

 

 

 

 

Return to search