An Integrated Site Controller-Network Monitoring System for Small Scale Hydroelectric Sites
Over the past decade more and more small scale hydroelectric power developers have faced the question of the economic feasibility of installing microprocessor based control systems for...
Efficiency in Auxiliary Electrical Systems
In 1984, during the preliminary design for the proposed second powerhouse at the Corps of Engineers' McNary Dam on the Columbia River, the more recent improvements and techniques...
Grand Coulee SCADA System Procurement
Purchasing a quality Supervisory Control and Data Acquisition (SCADA) or Energy Control System (ECS) at a reasonable price for a particular installation can be a challenging undertaking....
Generator/Motors and Adjustable-Speed Drives for Waddell Pumped-Storage Plant
This paper describes the pumping and generating units and associated electrical equipment planned for Waddell Pumped-Storage Plant. Waddell Pumped-Storage Plant is to be located near Phoenix,...
The Design and Operating Experience of a Multiplexer Application in Conventional Hydro Powerhouse Control
The design of the Bonneville Second Powerhouse control system presented an opportunity to replace conventional cables with a multiplexer system that would provide a two-way data communication...
Capabilities of Automated Control System Employing Advanced Programmable Controllers
This paper details Voith Hydro's range of experience in the use of Programmable Logic Controllers (P. L. C. 's) in the automation of new hydro electric sites....
Integrated Automatic Hydroelectric Plant Control
The increased acceptance and employment of microcomputers to control specific functions in small hydroelectric plants has led to computerized integrated total control of hydropower generation....
Voltage Versus Var/Power Factor Regulation on Hydro Generators
When paralleled to the utility bus, synchronous generators can be controlled using either terminal voltage or var/power factor regulation. Selection is dependent upon the size of the generator...
Large Low-Speed Generators with Skewed Supporting Parts
During the past decade, the demand for hydro-generators has been for increasingly high ratings, up to the present maximum of about 800 MVA. These low-speed machines have rotor diameters...
Control and Tests of Tims Ford Induction Generator
This paper will discuss the electrical control scheme and commissioning tests developed for a small induction generator installed by the Tennessee Valley Authority (TVA) at its Tims Ford...
Electrical Equipment for Pumped Storage Plants
Selection of generator/motors and other electrical equipment for pumped storage plants requires consideration significantly different than for conventional hydro plants. This is particularly...
Influence of Surface Finish on Thrust Bearing Life
The original pivoted pad thrust bearing installed and fitted at the Holtwood Power Station in 1912 by A. Kingsbury has been operating continuously since that time without any difficulty....
What is Wrong with our Hydro Generators?
A number of studies have already been presented on the refurbishment and modernization of hydro facilities and also the design and upgrading of the generators. This paper will partly deal...
McNary Powerhouse Generating Unit 14 Stator Core and Winding Replacement
The powerhouse contains 14 main generating Kaplan-blade units, each rated at 73,684 kVA at 0. 95 power factor. In early 1985 the decision to rewind and uprate Unit 14 was being finalized....
Accelerated Life Testing of Generator Coils
This paper presents a step-by-step procedure for doing a 400 hour, 60 Hz, 90 degree C accelerated life test on generator coils. Test procedure is as follows: 1. Initial coil examination...
Fretting Corrosion on Large Split Thrust Bearing Runners
In the early fifties interfacial slip was measured on laboratory models. Design improvements, resulting from these tests, were incorporated into later machines. These improvements appreciably...
Hydropower in the Kodiak National Wildlife Refuge
The Terror Lake Hydroelectric Project is unique in that it is the only energy project to be constructed in a National Wildlife refuge. A National Wildlife Refuge has few equals to blocking...
The Stanley Canyon Conduit Hydroelectric Project
The Stanley Canyon Hydroelectric Project is an excellent example of the maximum use of a natural resource. The project is a combined water supply and hydroelectric facility which received...
Simply Complex
In California, after years of uncertainties and overcoming a complex myriad of hurdles, a major 205. 5 MW hydroelectric development project, financed by Northern California Power Agency,...
Upper Yellow River Projects and Longyangxia Station
The river stretch from Longyangxia to Qingtongxia, with a head drop of 1,465 m in a distance of 1,023 km (including backwater length of the Longyangxia Reservoir) is the focus of this...