Processed-Snow Foundation Design at the Summit of the Greenland Ice Cap
The design and construction of a processed-snow foundation berm for an elevated building located at the summit of the Greenland Ice Cap is described. Weather conditions and design provisions...

Environment One: A Master Plan Study for a New Scientific Research Station at the Geographic South Pole
The existing research station at the geographic South Pole is approaching the end of its useful life. This master plan study focuses on determining the technical and functional requirements...

Cold Climate Building Research at Wasa Base, Antarctica
During the Antarctic summer season of 1988-89 a permanent Swedish research station was erected at Dronning Maud Land, Antarctica. The station, named Wasa, is situated on a nunatak. A corresponding...

Minnesota Road Research Project - An Overview
The Minnesota Department of Transportation in cooperation with the Federal Highway Administration and the Local Roads Research Board of Minnesota is constructing the Minnesota Road Research...

Spray and Ice Measurement Instrumentation for Ships
Bow slamming is the primary water delivery mechanism for ship superstructure icing. Spray flux is largely dependent upon hull dynamics, and cannot be computed numerically with current...

New Support for Pin-Hanger Bridges
To promote safety of their bridges, many state highway departments are considering ways to add auxiliary support to existing pin-hanger bridges. The Pennsylvania DOT and its open-end consultant...

Privatization Takes Flight
The number of air travelers in the U.S. is projected to double by early in the next century. Delays have also been mounting rapidly. Major airports around the world are facing the same...

Precipitator Retrofit and Repair: A Case Study
Described is a difficult fossil power station retrofit project performed on a tight schedule at a congested site. Installation of a new supplementary precipitator and structural repairs...

Properties and Environmental Impact of Stabilized Fly Ash
This paper summarizes the results of two research studies aimed at evaluating the properties and possible environmental effects of bituminous and lignite coal based fly ashes stabilized...

Stabilized Fly Ash Cover for a Municipal Waste Landfill
The study reported herein and several recently related projects have been aimed at reducing the hydraulic conductivity of fly ash and physiochemically fixing any potential leachable metals....

Environmental Aspects and Compliance Costs of Hydropower Regulation
Recent experiences by American Electric Power with respect to mitigation at hydroelectric project sites on the upper Ohio River indicate that compliance with environmental regulations...

Dam, Spillway and Hydropower Rehabilitation
Many older dams are in need of rehabilitation as a result of aging, deterioration, and more stringent safety standards. Current deficiencies include deterioration of original construction...

Hydro Rehabilitation?Innovative Solutions
Most hydro facilities have been in operation for many years and, consequently, must periodically have been rehabilitated. The high cost of energy, labor, materials, and financing dictate...

Automation of Union Electric's Hydro-Power Plants
Union Electric Company is spending twelve million dollars on Electronic Control and Monitoring equipment at two of their hydro-electric plants (a total of twenty-seven generating units)...

Advanced Composites Materials in Civil Engineering Structures
This proceedings of the Specialty Conference on Advanced Composites Materials in Civil Engineering held in Las Vegas on January 31?February 1, 1991 contains 40 papers from ten technical...

Cold Regions Engineering
This proceedings consists of papers presented at the Cold Regions Engineering Specialty Conference held in West Lebanon, New Hampshire from February 26-28, 1991. The papers cover nine...

A Computerized Completion
The original designers of the 1.6 million sq ft Fillmore Center in San Francisco (its largest mixed-use development project in 20 years) had specified a large amount of steel reinforcement...

Building Beneath Boston
Up/down construction is a method in which a project's substructure and superstructure are simultaneously built. The substructure's wall, column and foundation...

Fixing Foundations
Conventional underpinning or pilings are still the most common construction methods used to strengthen foundations, but new grouting techniques are giving engineers some fresh alternatives....

Making the New Look Old
Between March 1990 and January 1991, Annapolis buried overhead utilities and reconstructed the roadway around the historic State House, built in 1769. The paving stones, colonial-appearing...

 

 

 

 

Return to search