The Public/Private Condo
A 20-story office building in Chicago was built on publicly owned land under a condominium arrangement that allowed a developer full ownership of air rights over and above the 100,000...
The Parking Problem
Corrosion of parking garage decks has become a multi-billion dollar problem, caused primarily by deicing salts that seep into the concrete and attack reinforcing steel. Design and construction...
Computer Cuts Tower Steel
Two computer programs developed by Lev Zetlin Assoc., New York City, revealed that some of the steel in what will be Philadelphia's tallest building, One Liberty Place, was...
Innovations in the Design of Electrical Transmission Structures
New concepts are being advanced for the design of electrical transmission structures. The papers in this book cover the following: weather-element loading conditions, structural options,...
Port Expansion of Eastport, Maine
A recent pier expansion now allows Eastport to provide 40 feet of water at low tide. The pier expansion consists of a concrete-decked steel pipe pile-supported extension to an existing...
Prestressed Concrete Piling?Design vs. As-Built
The proper design, manufacture, handling and installation of prestressed concrete piles is essential to their structural integrity and long life. A quality control program must be designed...
Innovative Repairs to Steel Sheet Pile Structures
Several unique and many unusual repair techniques have been used to structurally rebuild steel sheet pile walls. An example of a unique repair to a cellular cofferdam utilizing a suspended...
Rehabilitation of Wharf No. 8?Port of Houston
A routine inspection of wharves at the Turning Basin Terminal, uncovered evidence of extensive damage, including evidence that the 30-inch diameter steel pipe piles supporting Wharf No....
Geotechnical Considerations in the Design of the Wando Terminal Wharf Extension, Charleston, South Carolina
The South Carolina State Ports Authority (SPA) is currently examining construction concepts for the proposed 1,200-foot wharf extension and 40 acres of adjacent upland development at the...
Port of Kismayo (Somalia) Rehabilitation
Extensive deterioration of the 2070 ft long four-berth, marginal wharf at the Port of Kismayo necessitated a major rehabilitation to maintain operations. The selected scheme was a steel...
The Mile High Dream
For the 1986 Tall Buildings Conference in Chicago, a group of experts studied the implications of a mile high skyscraper to be built of concrete. It is 500 ft square at the base, designed...
Predictions of Pile Shaft Capacity With the PLS Cell
In situ measurements of stresses and pore pressures on a model pile shaft, the Piezo-Lateral Stress (PLS) cell, are utilized to reconstruct the conditions of load tests involving two large...
Cable Stays Catch On
The three completed cable stayed bridges in the U.S.�Pasco-Kennewick in Washington, Luling-Destrehan in Louisiana and East Huntington in West Virginia�will soon be joined by another half...
Tunnel Ceiling Replaced over traffic
The ceiling of the Holland Tunnel under the Hudson River, connecting New Jersey and Manhattan, was 59 years old and needed replacement, a big job because there are 3 miles of ceiling in...
Postmodern Engineering
Momentum Place is a postmodern skyscraper in Dallas designed by architects John Burgee and Philip Johnson. The Datum-Moore Partnership, structural engineers, designed the structural system...
Recyclying of Dust from Electric Arc Funances�An Experimental Evaluation
Each year the electric arc steelmaking industry generates approximately 650,000 tons of dusts containing valuable metallic resources such as iron, zinc, lead, and chromium. EAF dust is...
Risk-Based Design of Inspection Programs for Detecting Leaky Underground Storage Tanks
A mathematical framework is developed for estimating the effectiveness of large-scale inspection programs for leaky underground storage tanks. The framework incorporates the leak likelihood...
Sulfide Corrosion and Control in the City of Modesto Primary Effluent Outfall (
The City of Modesto has a 60 inch diameter, 6- one-half mile long reinforced concrete pipeline conveying primary effluent from the primary treatment plant to the remote oxidation pond...
Hydrodynamics of Earth Fill Dam Breach Erosion
An analytical model is suggested in this paper. The model is based on the continuity equation of water mass within the reservoir, a broad-crested weir discharge formula and a velocity...
Optimizing Drain Spacing and Depth Using Steady State Equations
A method is developed for minimizing the total cost of establishing relief drains by choosing appropriate depth and spacing of the drains. Solution graphs are presented for a wide range...