Containing Construction Change with Computers
This paper discusses the benefits of managing construction change orders with computers over manual methods. Construction contracts formulate change procedures that are often at odds with...
Space Schedule Construction
The layout of temporary facilities on a construction site is affected by changes in a construction schedule, including changes in activity duration, resource selection, and resource allocation...
Using Product Models to Plan Construction
The conceptual design of the CasePlan case-based planning and scheduling system is presented. Case-based reasoning is a promising technique for capturing the expertise of contractors who...
Pre-Design Planning with Intelligent Project Development Brochure (IPDB) System
The functional design criteria and other technical requirements are to be established during the pre-design planning stage of a project. At this pre-design stage, the formulation of the...
Resource Constrained Time-Space Scheduling Model
This study aims to develop a resource constrained time-space scheduling model, mainly aiming application to pipeline laying world for gas supply under roads in urban area. This model can...
The Application of Gauss Numerical Integration Method in Arch Dam Trial-load Method Program
The characteristics of Gauss Numerical Integration Method are the unequal distance between nodes and fairly high accuracy. When the number of nodes is n, the algebraic accuracy can be...
Scheduling of Multi-Story Buildings in a Constraint Environment
Scheduling involves the allocation of resources over a period of time in order to perform construction activities, satisfying project constraints. These constraints, if present, must be...
An Integrated Acquisition, Storage and Retrieval Multimedia System for Constructibility Lessons Learned
Constructability is defined the optimum integration of construction knowledge and experience during conceptual planning, engineering, procurement and field operations to achieve overall...
The Denver Airport: Managing a Megaproject
If the 53 sq mi, $2.7 billion Denver International Airport seems daunting in size, imagine trying to manage its construction. Supported by over 100 firms, the five year-long project is...
Nondestructive Evaluation Techniques and Their Role in Infrastructure Management
Nondestructive evaluation (NDE) techniques can play an important role in infrastructure management. They can be used to assess current condition a well as to predict future performance...
Sonic NDT for Infrastructure Assessment
Sonic Nondestructive Testing (NDT) techniques are valuable tools for assessing infrastructure. Relatively recent innovations in the field can reveal the internal conditions of concrete...
Benefits From Improved Management of Pavement Facilities
Effective management of pavement facilities can provide several benefits both the agency and the travelling public over the long term. The benefits achieved from improved rehabilitation...
How to Get Local Public Works Agencies to Use Structured Infrastructure Management Approaches
As more agencies consider adopting infrastructure management systems, the lessons learned in developing and supporting the use of current systems should be used to structure the support...
Barriers for Innovation and Technology Transfer in the Public Works Infrastructure R&D
Utilization of technologies and innovation to revitalize America's public works infrastructure is beset with barriers. Some critical barriers, identified through literature review and...
A Graphics-Based System for Urban Roadway Management
This paper describes a graphics-based system for urban roadway management. The main objective of the system is to select the cost effective maintenance and rehabilitation (M&R)...
The TM? Railroad Track Management System
The TM$ Railroad Track Management System is designed to increase effective access to track performance data, to forecast the effects of deterioration and maintenance activity, and to formulate...
Using Condition Indexes to Evaluate Local Railroad Track Networks
The U.S. Army Construction Engineering Laboratories (USACERL) have developed condition indexes for assessing track condition that apply to local railroads. Indexes were developed for the...
Effective Use of Statistical Analysis for Data Collection and Model Development
Infrastructure managers require enormous amount of data for their planning, design, and construction operations. Often the emphasis on quality of data collection, analysis, and interpretation...
Economic Paradigms for Infrastructure Management
A key characteristic which has emerged in infrastructure management system is the use of economic models at the network level (as opposed to project level) to help in evaluating program...
An Integrated Design/Construction Research Program for Infrastructure Rehabilitation
The quality of America's infrastructure today is barely adequate to fulfill current requirements, and sufficient to meet the demands of future economic growth and development. This serious...