Tracking Cold Water in a Large Reservoir System
The Tennessee Valley Authority (TVA) Environmental River Resource Aid (TERRA) is a computer workstation graphics display that tracks environmental variables in the power service area....

Scientific Visualization Techniques Applied to Water Quality and Transport
Applying the advanced-computer technology available at the San Diego Supercomputer Center (SDSC), researchers from SDSC and the U.S. Geological Survey (USGS) simulated and visualized numerical...

Visualizing Groundwater Flow
This presentation demonstrates the application of some public domain scientific visualization software tools in the area of groundwater modeling. Specifically, we use these tools to interpret...

A Three-Dimensional Natural Resource Damage Assessment and Coupled Geographical Information System
A numerical model for natural resource damage assessments is discussed. The model addresses a wide range of spatial and temporal scales. The transport equations for both pollutant and...

TransAct: An Interactive Transient Analysis Program for Pipelines
The program TransAct is designed to analyze a wide range of transient responses that may have been caused by a complex combination of control actions. For example, there may be the simultaneous...

Spatially Varying Velocity Distribution in Non-uniform Open Channel Flow
The spatial variation of velocity distribution in non-uniform flows were studied, within the framework of a velocity distribution model derived by a probabilistic formulation and entropy-maximization....

Prescribed Solution Forcing Method for Model Verification
This paper describes a method for verifying the consistency and order of accuracy of a numerical implementation of a pde-model. We present an example of its application to a 3D hydrodynamic...

Proposed Methodology to Update Embayment Sedimentation Data for TVA Reservoirs
The purpose of this paper is to evaluate the accuracy and usefulness of bathymetric data resulting from routine fisheries and aquatic biology hydroacoustic surveys in TVA reservoirs for...

Use of Electronic Microprocessor-Based Instrumentation by the U.S. Geological Survey for Hydrologic Data Collection
The U.S. Geological Survey is acquiring a new generation of field computers and communications software to support hydrologic data-collection at field locations. The new computer hardware...

Ambient Suspended Sediment Concentration and Turbidity Levels
The temporal variation of suspended sediment concentration and turbidity is an important component of the riverine environment. The maximum rate of discrete volumetric sample collection...

Two-Dimensional Hydrodynamic Modeling of a Reach of the Mississippi River in Pool 19
A depth-integrated finite-element model (RMA-2V) was applied on a section of the Upper Mississippi River to study the hydraulic characteristics of the floodplain-river system. The area...

On The Application of Artificial Viscosity in Computational Hydraulics
Artificial viscosity is a particular kind of truncation error that is either implicity present or explicitly added to the finite difference schemes. It is shown that the method of lines...

Probabilistic Aspects of Hydroproject Maintenance
A survey of operation and maintenance personnel in the hydraulic structures sector was conducted to learn about the present maintenance approach and the perception of the probabilistic...

Coastal Watershed Unit Hydrographs and Methods
The results of a study to determine unit hydrograph peak rate factors for South Carolina coastal watersheds are summarized and compared with traditional values. An extension to the SCS...

Temporary Facilities?Making It Happen, Organization and Logistics
As construction projects become larger, more complex and are constructed both faster and under more adverse conditions--the use of temporary facilities is more prevalent. Temporary facilities...

CPM Techniques for Claims Avoidance and Preparation
Virtually all major construction claims consist of some aspects of delay, disruption or acceleration. Since all of the foregoing relate directly to the timing and sequencing of the project...

Design and Planning of Structural Steel Roll-In
Innovative construction methods were required to erect structural steel inside a 170 foot long box truss over a railroad. The contractor engineered and executed a unique system to roll...

Who Pays for the Unexpected in Construction: The Geotechnical Contractor's Point of View
Unexpected conditions are inherent in most construction projects and often lead to claims and legal action. Contract risk avoidance language force owners, engineers and contractors to...

Laboratory and Field Research in Construction Automation
This paper presents a series of research projects to build and test prototype systems. It has been found that prototyping provides an economical approach to support both basic and applied...

Animation of Automated Space Construction
This paper presents a discussion of Three-Dimensional Computer Animation as applied to the evaluation of Lunar/Mars construction. A number of applications for this type of tool are introduced....

 

 

 

 