Water Resources Planning for the San Antonio Region
Water resources planning for the San Antonio region begins with the physical setting and the technical considerations - the science and engineering aspects. It proceeds to the economic...

World Bank's Role in Global Water and Related Environmental Issues
The World Bank provides loans and technical assistance to developing countries for improvement of the physical and economic well-being of the people. A major portion of its lending is...

Conflict Resolution in Regional Water Management
The experience with environmental dispute resolution (EDR) at South Florida Water Management has been largely one of changing the operating premises regarding the agency's...

Planning for Future Hydroelectric Power: A Myth?
The hydroelectric power industry in the U.S. is authorized and regulated by the Federal Government through the Federal Energy Retgulatory Commission (FERC) under the Federal Power Act....

Strategies for Planning Metropolitan Water Supplies
Metropolitan growth and increased concerns for water quality and environmental impacts have created challenges for the provision of water supplies within metropolitan areas. The paper...

Optimal Control of the West Parisian Area Water Supply Network
The West Parisian Area regional office of Lyonnaise des Eaux has been equipped with computer-aided optimal decision-making software, using daily water demand forecasts. This tool calculates...

Simulation Model for Economic Irrigation Project Planning and Design
The principle design parameters considered are: water supply configurations (quantity, source and storage); shapes and sizes of the area to be served; on-farm irrigation techniques; cropping...

Comparison of n Values in Natural and Dredged Channels
Manning's n values were determined for three stream channels in two complex watersheds in North Mississippi. The study covered a wide range of channel conditions and flow...

Laboratory Analysis of Hyperconcentrations
The physical and kinematic behavior of hyperconcentrations has been reviewed and a summary of recent and past developments in hyperconcentrated flow research is presented. This paper focuses...

Breakwater Choices
Most of the maritime breakwaters built throughout the world are of the rubble mount type, with a protective armor constructed of artificial blocks. Despite the multitude of different shapes...

Predicting Human Instability in Flood Flows
The delineation of high flood hazard zones within a flood plain is usually independent of the parameters that constitute a life threatening situation. In order to define human instability...

Climate Change and U.S. Water Resources: Results from a Study by the American Association for Advancement of Science
The time horizon of the changes that might occur is similar to the time required for planning, approval, funding, construction and economic life of such major water facilities as dams,...

Effects of Climate Change on Watershed Runoff
This paper examines forecasts of changes in watershed runoff in the Delaware River basin that result from a range of predicted effects of increased atmospheric carbon dioxide (CO2)...

Seven Oaks Dam Outlet Works Design
The U.S. Army Corps of Engineers has completed the preliminary design of the outlet works for the proposed Seven Oaks Dam. The dam is the upstream-most feature of the Corps'...

The Hydro Business: 1990 and Beyond
During the last ten years, hydroelectric generation received more and more attention as a source of reliable and economical electricity. Since the first WATERPOWER conference, the industry...

Joint Economic Evaluation of Pumped Storage in Colorado
This paper summarizes a joint planning study completed in December 1988 on the economic potential of pumped-storage development. The study was unusual in water development investigations...

Devil Canyon Second Afterbay
This project is located in the City of San Bernardino (Southern California). The addition of a second afterbay for the Devil Canyon Powerplant has been in the planning stages since October,...

Case Study Incremental Approach to Cost Analysis for Improvements to Wise Powerhouse Penstock
In 1980, Pacific Gas and Electric Company (PG&E) began studying the addition of a second powerhouse to the existing Wise Hydroelectric Project. Because of the existing project...

Economic Trade-Off between Hydropower and Other Competing Water Uses: A Case of Coteau Creek Station
Using the Coteau Creek hydropower generating station in Saskatchewan as a case study, economic trade-offs between water used for hydropower generation, and irrigation and recreational...

Effects of the Environmental Approval Process on Project Scheduling and Economics
The environmental approval process is fundamental to the permitting of hydropower projects. Recent changes in permitting requirements has had a significant effect on the cost and schedule...

 

 

 

 