Seismic Rehabilitation: Why, When and How
Common methods of seismic rehabilitation are: repair of cracks, reconstruction of structural elements, addition of stiffening elements, and addition of dampers. A major consideration is...

The Impact of the Construction of Public Works by the Earthquakes of September 1985
The earthquake of September 19th and 20th, 1985, is discussed with emphasis on general damage. The works of the Head Office of Urban Services is described in relation to emergency response....

Recreation Planning and Design for Floating Cities
The role and place of recreation planners and designers in multidisciplinary research for floating cities of the 21st Century and emerging marine recreation concepts and their relationship...

Institutional Constraints to Coastal Zone Management: A Case Study of Hawaii (abstract)
The problems that plague Hawaii's coastal zone management are primarily the result of 'institutional' factors, some of them rather unique. These...

Pass a Loutre Freshwater Diversions: Marsh Building in the Mississippi River Delta
Concern about the rapid loss of wetlands within the Pass a Loutre Wildlife Management Area located at the mouth of the Mississippi River has resulted in implementation of the Pass a Loutre...

Building Around a Building
Many, maybe most, construction disasters occur as the result of the failure of temporary structures. Despite the fact that temporary structures have a critical effect on the speed, safety...

Strengthening Old Floors
The floors of the historic City Hall and Courthouse in Minneapolis had withstood 80 years of hard use before they have to be analyzed and brought up to code. The building is about 300...

CZM: Evaluation of State and Local Power-Sharing
Since 1976, the Secretary of the U. S. Department of Commerce has approved coastal management programs in twenty-nine states and territories. No two state programs are alike, and they...

Risk Management of Oceanfront Resort Operations
The perception of high incidences of accidents related to open ocean recreational activities in Hawaii and the need for developing educational programs on water safety for resident and...

Coastal Flood Control Facility Design Parameters
The development of design parameters for a storm runoff detention facility located on lowlands adjacent to an estuary and discharging into the tidal zone are discussed. The parameters...

Offshore Oil and Gas NPDES Permits: Creative Solutions?Three Case Studies
The U. S. EPA has responsibility under the Clean Water Act (CWA) to maintain and enhance the quality of the Nation's waters. Section 402 of the CWA authorizes EPA to issue...

Developing Oceanfront Hotels on Built-Up Coasts: Resolving Public Access, Natural Hazards, and Community Character Conflicts
In the mid 1980s, a resurgence of hotel development took place along the oceanfront of the northern shore of New Jersey, a 35 mile reach of barrier spits and headlands intensely developed...

Changing Waterfront Uses on the River Clyde, Scotland: A Preliminary Survey
The River Clyde in Scotland was renowned for its shipbuilding and shipping facilities. However, dislocations combined with government policy have forced since the early 1960's...

Port Facility Development: Public Access and Mitigation Requirements
Coordination of compatible uses and resolution of use conflicts requires continuous effort, extending beyond the planning and permit process and requiring long-range committment of staff...

How to Provide Shoreline Public Access
Methods of providing access facilities are covered which range from outright acquisition, obtaining public easements, and converting street ends to conditioning development permits. The...

Making Embassies Safe for Democracy
American interests overseas have become among the most popular targets for terrorist attacks. Once, not long ago, security was only an afterthought for such facilities. Today, $4.4 billion...

A Safer Earthquake Design Approach
The Uniform Building Code earthquake code permits taking advantage of a frame's capacity to absorb energy at stresses beyond yield. Dropping that provision would save lives....

Sound Structure
A new concert hall in Dallas, Tex., has the first acoustical design done with the aid of computer simulations that also dictated the shape of the performance space. Those dictates, in...

Historic Bridges: Conflict Ahead
The engineer who deals with historic bridges becomes the focus of controversy in the course of determining the existing condition, predicting remaining useful life, and designing the repair...

Building Constructed Up and Down at Once
The One Westwood Building, now going up in Los Angeles' suburban Westwood, is being built up and down from ground level simultaneously. The key was a slurry wall surrounding...

 

 

 

 

Return to search