Buffalo Bill Dam Modifications?Modification of an Existing Bureau of Reclamation Facility to Increase Power Generation
This paper describes a joint venture between the United States Bureau of Reclamation and the State of Wyoming to increase the storage capacity and power generation capacity of Buffalo...
Analyses of the Lower San Fernando Dam Failure
The main methods employed for the back analysis of the behaviour of the Lower San Fernando Dam during the 1971 earthquake are described. The requirements for a comprehensive analysis are...
Analysis of Concrete Gravity Dams Using Microcomputers
Monenco Consultants Limited has developed a microcomputer program entitled 'DS2' for the stability analysis of concrete gravity dams. This paper discusses this...
Evaluating Uplift Pressures for Concrete Gravity Dams
An approach for evaluating uplift and dam foundation conditions, which resulted from the initial phases of an Electric Power Research Institute (EPRI) study is presented. An earlier study...
Tarbella?Third Extension Project Units 11 to 14: 440 MW Francis Turbine Design
At Tarbela Dam in northern Pakistan, the Third Extension Project, units 11 to 14 of 440 MW each, is presently under construction. When completed in 1992, the multipurpose hydro-irrigation...
Renewal of the Burt Dam Generating Station
The present redeveloped hydro facility operates as a 300 kW run-of-river station automated by a head pond level controller which adjusts turbine setting to match available river discharge....
Environmental Engineering
The 1989 Specialty Conference on Environmental Engineering was held in Austin, Texas on July 10-12, 1989 with cooperation from the University of Texas at Austin Civil Engineering Department...
Odors: The Other Effluent
Neighbors object to unpleasant odors emitted at wastewater treatment plants, and dealing with such odors requires tact as well as technology. The operators and engineers must listen to...
Hydro on Hold
Hydropower projects have become the target of a growing environmental movement overseas. The tradeoff between clean, renewable energy and the possible environmental impacts of the reservoirs...
Training the Waste Watchers
Whether an engineer is going to work at a Superfund site himself, or if his firm will be doing cleanup work at the site, that engineer will want to take the 40 hour training course as...
Quick Response on the Mississippi
In November 1987, the Mississippi River broke through the foundation of the St. Anthony Fall's Lower Dam Hydropower Plant. The plant's owner, the Northern State...
Safer Dams
During the last 11 years, thousands earth dams have been inspected. Here are four that were rehabilitated. Army Corps inspections are phase I of the program, and have been completed. The...
The Asbestos Agenda
Asbestos abatement business has been booming for years. The industry, though, is not restricted only to firms which do the removal. Companies who provide training, sell supplies and develop...
Assessing Site Assessments
Laier and Sibley contend that the growth in environmental site assessments, fast becoming routine in many types of real estate transactions, could create a windfall market for engineering...
The Race for Smart Cars
Prendergast describes the technological elements involved in Intelligent Vehicle/Highway Systems (IVHS), current programs in Europe, Japan and the U.S. aimed at implementing IVHS systems,...
High-Strength Concrete: Weighing the Benefits
Russell, Gebler and Whiting describe the properties of high-strength concretes, the current state of knowledge on freeze/thaw effects, and procedures for batching, mixing, transporting,...
Rx for Dam Repair
Bernard asserts the growing importance of maintenance to extend the service life of dams as more and more of them reach or exceed their design lives. He describes renovations to Easton...
Automated People Movers II
New Links for Land Use?Automated People Mover Opportunities for Major Activity Centers
This Proceedings, which consists of 94 papers presented at the Second International Conference on Automated People Movers (APM's) held in Miami, Florida on March 13-15, 1989,...
Regulatory Impact Statements
This paper suggests the issue of regulatory impacts be addressed in a manner analogous to environmental impacts, using a timely, comprehensive methodology. By 'timely'...
Mobilization for a Construction Project in an Urban Environment
Mobilization by a contractor for the construction of a major project must consider four basic objectives: efficient work performance, owner satisfaction, site safety, and minimal community...