Introduction to Structural and Mechanical Failure Modes for Nuclear Power Facilities
The three papers presented in this section discuss the types of information (i.e., dynamic tests, earthquake experience and analytical data) which are used in predicting the capacity of...
Leachate Flow from an Experimental Fly Ash Landfill
Combustion of coal in large-scale utility boilers produces an ash by-product which is often stored in open landfills. An experimental fly ash landfill was constructed by Pennsylvania Power...
Raising of an Ash Disposal Pond by Hydraulic Filling
Commercial and industrial development around existing power plant waste disposal sites often precludes the ability to expand these sites laterally. Limitations on land availability have...
Hydropower in the Upper Ohio River Basin: A Decade of Effort at Risk
The Federal Energy Regulatory Commission (FERC) issued licenses on September 27, 1989 for construction of 16 hydroelectric projects in the Upper Ohio River Basin after up to 8 years of...
Reviewing the History and Activity of FERC
Since passage of the Federal Water Power Act in 1920 (Part I of the Federal Power Act, 16 U.S.C. 791a et seq.), Congress has required those seeking to construct, operate, or maintain hydroelectric...
Environmental Aspects and Compliance Costs of Hydropower Regulation
Recent experiences by American Electric Power with respect to mitigation at hydroelectric project sites on the upper Ohio River indicate that compliance with environmental regulations...
The Changing Legal Structure of Non-Utility Generation in the 1990's
Before actual construction of a small power production or cogeneration facility commences, numerous economic, technical and legal factors have been considered during the planning process....
Facing the 21st Century with an Aging Hydro System
The Tennesse Valley Authority (TVA) has implemented a comprehensive study of their hydroelectric plants in order to extend their service life for the next 50 years into the 21st century....
Hydro Rehabilitation?Innovative Solutions
Most hydro facilities have been in operation for many years and, consequently, must periodically have been rehabilitated. The high cost of energy, labor, materials, and financing dictate...
Automation of Union Electric's Hydro-Power Plants
Union Electric Company is spending twelve million dollars on Electronic Control and Monitoring equipment at two of their hydro-electric plants (a total of twenty-seven generating units)...
Acid Mine Drainage: An Overview
In the United States, acid mine water adversely affects over 6,500 km (4,000 miles) of rivers and streams. This is, however, a significant improvement over the situation two decades ago....
Wetlands for Acid Mine Drainage Treatment
Wetlands are being constructed on mined lands to treat acid mine drainage. Most of these wetlands remove a substantial amount of iron and sulfate from the water, but manganese removal...
Nuclear Plant License Renewal: Benefits, Feasibility, and Process
The future of power plants in the U.S. is of growing concern. The need for competitively priced and economically safe plants is a must. The reluctance of the utility industry to produce...
Ash Disposal at Coal Creek Station
This paper outlines the effort of two utilities to minimize the impact of an 1100 megawatt lignite fired plant's waste stream on the environment. Current regulations, poor...
Beneficial Use of Coal Ash as a Structural Fill
For decades, electric utility companies have and will continue to dispose of their coal ash in various waste disposal sites. In the state of Pennsylvania, the Beneficial Use of Coal Ash...
Failure Modes of Flat Bottom Vertical Storage Tanks
Flat bottom vertical storage tanks are important components in essential nuclear power plant safety systems. Data on the seismic capacity and failure modes of such tanks have been identified,...
Innovative Aspects of the DQE/GPU Project
The DQE-GPU joint project is an endeavor at supplying electricity to its customers in an economically competative way. The project cosists of using existing power stations in the Three...
EPA's Development of Environmental Standards for High-Level and Transuranic Wastes
EPA is in the process of developing standards for the disposal of high-level and transuranic wastes. This development process is in response to a Court order that remanded standards that...
First Update to the U.S. Nuclear Regulatory Commission's Regulatory Strategy for the High-Level Waste Repository Program
The U.S. Nuclear Regulatory Commission (NRC) staff has updated its initial regulatory strategy for the High-Level Waste Repository Licensing Program. The update describes changes to the...
Regulatory Issues Impacting the U.S. High-Level Radioactive Waste Management Program
This paper addresses current key regulatory issues impacting the U.S. high-level radioactive waste management program. The following issues pertain to the licensing of a geologic repository:...
Return to search