Waterpower Development: A Renewed Partnership
Efforts to meet the water supply and energy needs of the country in a changing economic, environmental, and technical environment create new opportunities for joint action by water and...

The Outlook for the Hydro Business
Hydropower business activity has grown in the eight years since the WATERPOWER conferences began in 1979. During this time, however, small hydro has faced many ups and downs. Relicensing...

The Pacific Northwest Rivers Study: Development of a Rivers Inventory and Analysis System
To minimize conflicts between hydropower development and resource conservation, the Bonneville Power Administration and the Northwest Power Planning Council initiated the Pacific Northwest...

Hydropower Development for Hawaii
A site specific, evaluation technique is being studied to examine hydropower potential based on an operations research approach for micro- and mini-hydropower systems under established...

Hydropower Development of the Hongshuihe, China
Power is the predominant factor in the development of the Hongshuihe River. The Province of Guangdong is the most highly developed area in the Pearl River Basin, where the fast growing...

Sri Lanka's Mini-Hydro Rehabilitation Programme
As part of Sri Lanka's medium term investment programme funded mainly by the World Bank and Asian Development Bank, the British Government's Overseas Development...

Hydro Development on the Huallaga River in Peru
The proposed Chaglla Hydroelectric Project, is located on the Huallaga River in Central Peru, about 300 km north east of Lima. The available gross head of 870 m and regulated flow of 58...

Small Hydro Studies in Northern Thailand
As part of the Thai Government's programme of rural electrification, Balfour Beatty Engineering (BBE) has been assisting the Provincial Electricity Authority (PEA) in the...

Pumped-Storage Project Site Selection
The paper presents a case history in the selection of a site for a large pumped-storage project for Oglethorpe Power Corporation. The case history illustrates how a large number of potential...

Pumped-Storage: An Analysis of Optimal Capacity
This paper presents a systems analysis procedure to evaluate planning alternatives for pumped-storage operated in an existing power system. This procedure can be used by planners and engineers...

Pumped Storage and Compressed Air Storage, A Comparison
Pumped storage hydroelectric power plants and compressed air energy storage (CAES) plants are used for peaking and intermediate duty on electrical utility load systems. In comparing pumped...

New Opportunities for Pumped Storage Projects
A variety of design, economic, power supply, and environmental factors are combining which will bring a resurgence to the interest in developing pumped storage projects in the early 1990's...

Refurbishment and Modernization of Hydro Plants
In order to assemble experiences, settle and systematize the problems connected with rehabilitating and redeveloping hydro power plants and to work out proposals a project titled 'Refurbishment...

Outage Time and Its Effects on Rehabilitation Philosophy ? A Case Study
The Abitibi-Price Paper Mill located in Grand Falls, Newfoundland presently has eight (8) hydro-generating units in operation to assist in offsetting the power demands created through...

Expansion of Three Plants on the Saranac River
The capacity of three cascading hydro power plants, owned and operated by New York State Electric and Gas Corporation on the Saranac River near Plattsburgh, was expanded by a total of...

Selection of Jim Falls Turbine Generators
The selection of the unit configuration for the Northern States Power Company's Jim Falls Hydro Redevelopment Project was based on an extensive evaluation of various turbine...

Considerations for Retrofitting Large Dams for Hydropower
The majority of large dams which are currently being retrofitted for hydropower are either flood-control impoundments or navigation structures. In the Ohio River Division of the U. S....

Hydropower retrofit at the Toledo Bend Dam
Since the early 1970's, the Authorities have been examining the possibility of utilizing sluiceway releases to generate hydroelectric power to meet most of the demands of...

Optimizing Hydropower Potential Using Water Management Techniques
The development of hydropower facilities at existing dams creates an interesting dilemma to both public and private hydro developers: Is the proposed development the best-adapted use of...

Rehabilitation of Existing Hydro, Our Oldest Natural Resource
With renewed interest in hydro, many old sites are being rehabilitated to achieve maximum power output and higher efficiencies. Rehabilitated plants are now performing at optimal levels,...

 

 

 

 