Some Pertinent Considerations in Dam and Reservoir Design
Two important considerations in designing and constructing a multipurpose earthdam and reservoir are to minimize losses in the event of dam failure because of overtopping, and to conserve...

Automation of Existing Dam Control Schemes
For installations that are already in operation, the following advantages are obtained from installing new electronic equipment: In the case that the dam or certain measuring stations...

Trashrack Cleaning?A Job Requiring Utmost Care
During the last few years, the tendency in most industries has been towards more automation. Hydro has been no exception. Trashrack raking machines have followed this trend, and automatic...

Uplift under Concrete Dams on Rock
While the possible existence of uplift pressures within dams and foundations is no longer questioned, there is still considerable controversy over the magnitude and distribution of uplift...

Uplift Pressures in Existing Concrete Dams
This paper is a brief summary of a report of the same title prepared for the Electric Power Research Institute (EPRI) as part of its program to study ways to economically improve dam safety....

Uplift Pressure below Gravity Dams on Rock
The magnitude of the uplift force at the base of a concrete gravity dam founded on rock is strongly dependent on the properties of the discontinuities within the rock mass. This paper...

Effect of Seepage in Cracks in Older Gravity Dams
One of the many problems encountered by dam designers is that of estimating uplift pressures in cracks within older concrete dams. As part of ongoing research, we are investigating this...

Tunneling through an Existing Concrete Masonry Dam
The Gregory B. Jarvis Hydroelectric Project is located in Upper New York State on the West Canada Creek. Existing facilities include a non-overflow concrete gravity dam, 65 feet long and...

Cofferdams: An Integral Part of Small Hydro Design
Cofferdam construction costs can be a major factor in the viability of a small hydro development. For this reason, cost-effective design and construction are critical. A cost-effective...

China's Ertan Hydroelectric Project
Ertan will be a major hydroelectric project on the Yalong River in China. The project consists of a 240 m high arch dam, two tunnel spillways, an overflow spillway, mid- and low-level...

Design Considerations for a Penstock Located in an Outlet Tunnel at the Jennings Randolph Dam in West Virginia
The proposed production of hydropower at this flood control-recreation dam involves the installation of a 78 inch diameter steel penstock at the crown of the existing tunnel. The penstock...

Flashboard Alternatives Including Rubber Dams
This paper reviews some common flashboard methods used in the northeastern part of the U.S., and discusses the advantages and disadvantages of each type. The inflatable rubber dam is presented...

The Modification of Leroy Anderson Dam
An extensive modification program has been implemented to improve the safety and enhance the performance of the Leroy Anderson Dam. The Leroy Anderson Reservoir has a maximum storage of...

Analysis and Rehabilitation of Ambursen Dams
This paper deals with the investigation and analysis of two Ambursen dams located in the upper Midwest. These investigations revealed that the original design contained significant defects,...

Dam Rehabilitation and Fish Lift Design at the Pejepscot Hydroelectric Project
The rehabilitation work on the existing rockfilled timber crib dam comprised an assessment of the existing dam stability; analysis of the existing hydraulic conditions to establish the...

Modeling a Small Side Channel Spillway-Model Testing Need Not Be Expensive or Time-Consuming
Effective hydraulic modeling can often be done without sophisticated laboratory equipment and instrumentation, yet provide adequate design information in less time and at less cost than...

Physical Model Study of New York State Dam
The New York State Dam is located on the Mohawk River near its confluence with the Hudson River. Downstream from the dam, the river flow is divided into six channels as the water passes...

Spillway Crest Development through Model Testing on Chenderoh Ambursen Dam
The Chenderoh Hydroelectric Project on the Perak River in Malaysia was placed in service in 1930. The hollow Ambursen dam was modified in 1944 by the additions of a concrete cap with flashboards....

Safety Evaluation of PG&E Dams
Pacific Gas and Electric Co. (PG&E) owns and operates 71 hydroelectric power projects in Northern and Central California. With 115 dams in its system, PG&E is the largest...

Ghost Dam Safety Evaluation
Ghost Development, owned and operated by TransAlta Utilities, is near the eastern margin of the Rocky Mountain Foothills, approximately 33 km northwest of Calgary, Alberta. The development...

 

 

 

 

Return to search