Site Constraints Complicate a Bulkhead Replacement: It Takes a Team to Overcome the Challenges
North American Aggregates (NAA), a leading supplier of aggregates in the New York area, recently constructed a new processing facility in Perth Amboy, NJ. One of the final components of the new facility...

Proposed Rule Would Limit Clean Water Act Protection for Certain Streams, Wetlands
A draft proposal released in December by the Trump administration aims to simplify the process of determining whether a body of water is protected by the Clean Water Act....

Offshore Technology in Civil Engineering
Hall of Fame Papers: Volume 12
This collection contains five papers of coastal engineering significance that were inducted in 2017 into the Hall of Fame at the Offshore Technology Conference....

Innovative Use of a Groin Structure: Saving Cost, Shortening the Schedule, and Minimizing Impacts
Almost any type of construction activity can pose a shock to the surrounding environment and habitat. Obviously, the extent of the impact will depend on the location of the project and...

2013 National Concrete Canoe Competition, Swamp Test
A swamp test being performed by California State University, Sacramento at the 2013 National Concrete Canoe Competition, held June 20-22, 2013 at the University of Illinois at Urbana-Champaign,...

2012 National Concrete Canoe Competition, Swamp Test
A swamp test being performed by Rutgers University at the 2012 National Concrete Canoe Competition, held June 14-16 in Reno, NV....

Selected Coastal Engineering Papers of Robert L. Wiegel
Civil Engineering Classics
Sponsored by the Coastal Zone Management Committee of the Coasts, Oceans, Ports, and Rivers Institute of ASCE. This collection contains 54 papers and...

Restoring Coastal Louisiana
Enhancing the Role of Engineering and Science in the Restoration Program
Louisiana's coastal wetlands represent a significant natural and economic resource for the state and the nation but have been disappearing at a rate of 25 to 35 square miles...

Wetlands at Work
As urbanization spread to the southern portion of Staten Island�the home of New York City's last large stand of freshwater wetlands�the New York City Department of Environmental...

Impact of Ground Water Management on the Hydropattern of Wetlands
In this paper, we examine the effect of altering the pumping rates of a large municipal well field, on the hydropattern of the near by PENSUCO wetland. A flow model developed earlier using...

Breakwaters '99
First International Symposium on Monitoring of Breakwaters
The papers present state-of-art methods and technologies that are used in the structural and environmental monitoring of rubble mound breakwaters. Structural monitoring concerns the structural...

Rising Tide
In an effort to accommodate a new light-rail system in New Jersey between Camden and Trenton, the state's Department of Transportation began the formidable task of enhancing...

Physical Model of Current-Induced Scour at Ventura Harbor
This paper describes a 1:25-scale movable-bed physical model study of scour resulting from longshore current passing through a narrow gap on the leeside of the detached breakwater at Ventura...

Berm Breakwaters?Design, Construction and Monitoring
The philosophy of the fieldwork of Berm breakwaters was applied in Iceland. A few case histories were described with emphasis on quarry investigations, design, construction and monitoring....

Comparison of Hydrodynamic Parameters for a Floating Breakwater
The U. S. Army Engineer Research and Development Center is in the process of developing a Rapidly Installed Breakwater System (RIBS) for use in Joint Logistics Over the Shore Operations...

In Situ Behavior of Breakwaters in Constantza Port?Romania
In order to build breakwaters, especially in the areas with heavy storms, a special analysis on the several factors is necessary. In addition, surveillance of time behavior of breakwaters...

Montioring and Modeling of Tandem Breakwater System at Hammond, IN
A tandem breakwater system was constructed in 1989-90 to provide protection for a large marina at Hammond, IN, at the south end of Lake Michigan. A five year monitoring program (1993-98),...

Design and Construction of the Pier J Breakwaters at the Port of Long Beach, California
Several different alternatives to mitigate surge activity were investigated. The most acceptable solution was a pair of new breakwaters that altered the basin geometry to change the basin...

Construction Factors and Monitoring Methods Relating to the Performance of Ventura Breakwater Core Loc Repair
In 1999 the Los Angeles District of the U.S. Army Corps of Engineers (USACE) repaired the north Ventura breakwater head. The head was rebuilt using 2-ton underlayer stone armored with...

St. George Habor?Berm Breakwater Construction Considerations
During the period 1984-1987 three berm breakwaters with a total length of approximately 800 meters were constructed at St. George Harbor on St. George Island in the Pribil of Chain of...

 

 

 

 

Return to search