From Good to Great: The Evolution of Cutoff Wall Quality Control and Verification Techniques
The last three decades have brought tremendous improvements to quality control (QC) procedures for construction and post-construction verification of deep cutoff walls installed in active high-hazard dams....
A Brief History of Jet Grouting in the Last 50 Years: The Story of Its Evolution
Jet grouting, a grouting soil improvement construction technique, was first developed in Japan in the 1960s and 1970s, and then introduced in Europe a few years later in the form of a proposal for soil...
Power and Speed
A new venture aims to build an underground cargo distribution system that operates at airline speeds using an electromagnetic levitation and propulsion system....
Trump Administration Highlights Need for Infrastructure Spending, Permitting Reform
As part of a week dedicated to infrastructure, the Trump administration focused on aviation reform, increased federal funding, and efforts to reduce regulatory requirements for infrastructure projects....
Evaluation of Vertica Retaining Wall Systems
Prepared by the Highway Innovative Technology Evaluation Center (HITEC). This report describes a HITEC evaluation designed to determine the basic capabilities...
Journal of Sustainable Water in the Built Environment
The Journal of Sustainable Water in the Built Environment presents activity and research developments in water issues, challenges, and opportunities throughout the developed landscape. The scope covers...
Quality Assurance/Quality Control
The contract between the purchaser and the supplier shall state the responsibilities of each party and the conditions under which the work will be accepted or rejected....
Condition Indices, Performance Measures, and Managing Performance Data for Geotechnical Asset Management � Don't Get Buried!
Why don't transportation agency assets like pavements, bridges, and earthwork have a Check Engine light? Why can't you simply pull up the complete history and life cycle plan for them?...
Design of Urban Stormwater Controls
Fully updated to address the paradigm shift in the way stormwater is viewed and managed, Design of Urban Stormwater Controls focuses on consolidating technologies to foster a convergence...
Evaluation of the KeySystem II Retaining Wall
By Keystone Retaining Wall Systems, Inc. with TenCate Geosynthetics Geogrid Reinforcement
Prepared by the Highway Innovative Technology Evaluation Center (HITEC). This report describes a HITEC evaluation designed to determine the basic capabilities...
Evaluation of the Stone Strong Gravity Wall System by Stone Strong Systems: Final Report
This report was prepared as part of the HITEC evaluation for earth retaining systems. This evaluation was performed on STONE STRONG gravity walls, a precast modular wall developed, designed,...
Existing Sewer Evaluation and Rehabilitation
Fully revised and updated, this authoritative volume offers the most comprehensive information available on maintenance, repair, rehabilitation, and replacement of existing sewers. This...
Field Quality Control
A good quality control program helps ensure that technical requirements of the grouting are met and also adds to the overall success of a grouting project. The quality control program...
Renewal Methods
This chapter presents an overview of different methods that can be used for culvert and storm sewer renewal. For each method, product main characteristics, method description, construction...
Watershed-Based Permitting ? A Myth or Reality?
The United States Environmental Protection Agency has promulgated the Total Maximum Daily Load process to achieve the goals of the Clean Water Act. The TMDL processis applied to water...
Domestic-Well Water-Quality Data and Reports for the Environmental Public Health Tracking Network: USGS and CDC Collaboration
The mission of the Environmental Public Health Tracking (EPHT) Program is to provide information from a nationwide network of integrated health and environmental data that drive actions...
A Decision Framework for Stormwater Control in Urbanized Watersheds
Historically, urban growth occurred around water bodies due to factors such as easy access to transportation, water supply, and drainage. With the expanded transportation network along...
Mitigation of Impervious Surface Hydrology Using Bioretention in North Carolina and Maryland
As an increasingly adopted stormwater best management practice to remedy hydrologic impairment from urban imperviousness, bioretention facilities need rigorous field performance research...
Evaluation of Geopier Rammed Aggregate Piers by Geopier Foundation Company
Final Report
Prepared by the Highway Innovative Technology Evaluation Center (HITEC). This report describes a HITEC evaluation designed to determine the basic capabilities...
Building Code Requirements and Specification for Masonry Structures
Containing Building Code Requirements for Masonry Structures (TMS 402-08/ACI 530-08/ASCE 5-08, Specification for Masonry Structures (TMS 602-08/ACI 530.1-08/ASCE 6-08) and Companion Committees
The Code covers the design and construction of masonry structrures while the Specification is concerned with the minimum construction requirements for masonry in structures. Some of the...
Return to search