The Development of Tidal Resources in China: The Tidal Experimental Station of Jiangxia and Its No. 1 and No. 2 Bidirectional Tidal Water Turbine
This article outlines the development and use of tidal energy, specifically, the exploitable tidal energy and the situation of its use in China and introduces the first large bidirectional...

Foundation Studied for Turbine-Generator on Liquefiable Soils
Turbine-generator foundations are generally constructed of concrete in the U.S.A. This paper deals with the dimensioning and evaluation of a turbine foundation in Oxnard, California. The...

Stochastic Control of Hydropower Systems
A two-level stochastic control method is presented for the real-time operation of hydropower projects. The first level assumes fixed turbine discharges and utilizes probabilistic inflow...

Important Aspects of Annual Energy Calculation Techniques for Low Head Hydro Power Plants
Annual energy calculations are frequently used to optimize design parameters at a turbine site and to compare energy production based on equipment offers from various suppliers. In this...

First 10 Years of Operation of The La Grande Hydroelectric Complex
The first turbine of the La Grande hydroelectric Complex (Quebec, Canada) was commissioned in october 1979. Since then, five reservoirs, two rivers diversions, three power stations with...

Design of Isolated Small Hydro Stations
This paper presents some ideas concerning the criteria for the design of small hydro power stations operating isolated, and specially those to be installed in remote areas. Subjects covered...

A Design Parameter Study of Turbine Draft Tube by Viscous Flow Analysis
Viscous flow analysis based on the full Reynolds-averaged Navier-Stokes equations is being applied to predict successfully turbulent flow characteristics and energy losses in different...

Mitigation of Ice Effects at Hydroelectric Intake Structures
The design and operation of hydroelectric facilities throughout the northeast United States and Canada must contend with winter conditions for a large part of their yearly operation. During...

Fishery Assessments at Hydroelectric Projects Using Electrofishing, Nets, and Hydroacoustics
Assessments of fish population and entrainment were made at a hydroelectric generating station and spill dam on the Ohio River. By combining complementary sampling techniques, full assessments...

Computerized Measurement of Turbine Flow and Performance, Including Penstock Protection
The application of computer technology now makes it possible to measure turbine flows accurately, reliably and economically. The measurement is based on the differential pressure produced...

New Martinsville Hydroelectric Project
The New Martinsville Hydroelectric Project consists of a dual bulb unit, 34 MW powerhouse constructed at an existing lock and dam navigation facility. The project was completed on budget...

Bonneville I Powerhouse Station Service Unit Rehabilitation
This paper presents the work being done towards the rehabilitation of the Bonneville I station service unit. The rehabilitation of this unit includes a generator rewind, excitation system...

Vertical Axis Hydro Turbines for Off Grid Installations
This paper describes the design, manufacture and testing of a 5 kW floating VAHT for use in tidal, ocean, and river installations. This work is based on the results of research contracts...

The Use of Interior Guide Tube in Cross Flow Turbines
The Cross Flow Turbine has the distinct advantage of lower initial and operating costs over other small scale turbines, but it is believed to lack somewhat in efficiency. In this study...

Characteristics of the Independent Turbine Testing Facility
The Independent Turbine Testing Facility (ITTF) located at the St. Anthony Falls Hydraulic Laboratory has recently undergone extensive upgrading, partially funded by a grant from the small...

Trouble-Shooting Large Hydroturbine Bearings
Special problems associated with very large thrust and guide bearings and lubrication systems are presented, and cover common trouble spots, with examples. Various large hydroturbine bearing...

Optimizing Joint Load Control for Hydroelectric Plants
This paper discusses a method to minimize water usage at a multi-turbine hydroelectric generating plant. At plants which do not spill water this optimization is directly converted to extra...

Programmable Logic Controller Based Governor/Plant Controller
This paper discusses the performance characteristics of the programmable logic controllers (PLC's) is based governor, particularly speed resolution and response times. The...

Oil Hydraulic Design for Turbine Control
The paper addresses three areas of Oil Hydraulic Design for Francis and Kaplan Turbines: smart accumulator condition sensors, high flow servo logic, and high pressures Wicket Gate cylinder...

Considerations to Be Taken in the Design of Speed Increasers for Hydroturbine Service
The paper discusses the incorporation of a speed increaser specification that is primarily functional yet one that will address the cost, reliability, efficiency, and life requirements...

 

 

 

 

Return to search