The Use and Performance of Seepage Reduction Measures
The utilization and performance of various foundation seepage reduction measures from over 100 dams situated on pervious soils throughout the world has been reviewed. Summary discussions...

Seepage Control for Embankment Dams USBR Practice
The current Bureau of Reclamation approach to seepage assessment, analysis, and design for embankment dams is described. The advantages and appropriate applications for the analysis programs...

Chemical Grout Curtains at Ox Mountain Dams
Grout curtains were constructed in granodiorite bedrock as part of two earthfill diversion dams at a sanitary landfill site on the San Francisco, California peninsula. The curtains are...

Embankment Foundation Densification by Compaction Grouting
Compaction grouting is an attractive alternate for in-place densification of liquefiable soils below existing structures. Compaction grouting application concepts and procedures are presented...

Issues in Dam Grouting
Although perhaps the largest number of individual grouting projects do not involve dams, by far the largest volume of grout used is for grouting of new or existing dams. This volume presents...

Overtopping of Small Dams?An Alternative for Dam Safety
A research effort was initiated in 1983 by the Bureau of Reclamation to gain insight in the development of cost-effective modifications to small embankment dams which would enable them...

Planned Overtopping of Embankments Using Roller Compacted Concrete
Three recent projects are discussed where the economy and versatility of roller compacted concrete (RCC) were utilized to allow flood water overtopping of small to medium size embankment...

Embankment Overtopping
Embankment overtopping and dam safety are major concerns of civil engineering and the general public. Very little is known about overtopping events and much less has been published or...

Performance of Cogoti Dam Under Seismic Loading
At the time of its completion in 1938, the 280 ft (85 m) high Cogoti concrete face rockfill dam was exceeded in height by only one other dam of its type in the world, Salt Springs Dam....

New Exchequer Dam, California
New Exchequer Dam design, in 1963, was in the transition period in which dumped rockfill was being recognized as having undesirable settlement characteristics, and compaction of rockfill...

Design, Construction & Performance of Fades Dam
The project, construction and performance of les Fades dam are described. Les Fades dam is one of the first concrete faced rockfill dams compacted with a vibratory roller. A vibratory...

Weak Rock in Two Rockfill Dams
Two South Australian concrete face compacted rockfill dams, built from soft rock won from each dam site, have performed successfully in service with only small leakage and settlements...

Alto Anchicaya Dam?Ten Years Performance
The general aspects of design and construction of the Alto Anchicaya Dam duilt during 1970 - 1974 in Colombia, South America are described. The paper refers to the performance of the structure...

Membrane Sealing of Rouchain Dam
A synthetic sealing membrane was used to prevent excessive leakage through the facing of an embankment dam. The works, which were completed rapidly and at low cost, enabled the reservoir...

Golillas Dam?Design, Construction and Performance
Golillas Dam is a concrete face, gravel fill dam, 125 m (410 ft) high built seven years ago that has had some difficulties during its initial operating years; due to the shape of the canyon,...

The Outardes 2 Concrete-Faced Rockfill Dam
The main dam of the Outardes 2 development consists of a rockfill embankment, built against an old water-retaining structure, and faced with an upstream concrete membrane. The interface...

The R. D. Bailey Dam, a Concrete-Faced, Earth-Rockfill
A case history for the R. D. Bailey Dam, describing its comparatively unique design and construction considerations, and its operational performance since initial reservoir filling in...

Foz do Areia Dam?Design, Construction, and Behaviour
The 525 ft (160 m) high Foz do Areia dam in the Iguacu River, Parana, Brazil, built by 'Companhia Paranaense de Energia - COPEL', between 1975-1980, is part of...

Construction of Foz do Areia Dam
The methods and equipment for the construction of Foz do Areia Dam during 1976-1980 in Brazil are described. Special emphasis is given to the rockfill construction. Foz do Areia was the...

Mangrove Creek Dam: Use of Soft Rock for Rockfill
Mangrove Creek Dam is an 80 m high concrete faced rockfill dam (CFRD) completed in 1981. The embankment was constructed largely out of low strength sandstones and siltstones available...

 

 

 

 