Remedial Design and Construction to Improve a Sliding Embankment
The paper describes the studies made to identify the nature of possible remedial measures such as improved drainage, removal of the weak clay layer or a provision of a buttressed dam....

Seismic Stability Modification Designs for Embankment Dams
The Bureau of Reclamation (Reclamation) has recently designed rehabilitations for four embankment dams to ensure their seismic stability. A fifth project is scheduled for construction....

Seismic Rehabilitation of Sardis Dam
Extensive subsurface investigation of the embankment dam revealed the existence of a weak layer of silt and soft clay in the original topstratum clay underlaying the upstream shell of...

Liquefaction Potential Leads to Dam Reconstruction
Results of a visual inspection of the Dundee Dam conducted in 1982 revealed the presence of seepage on the downstream toe of the left embankment. Subsequent subsurface explorations and...

Using Innovative Technologies and Geosynthetics in Embankment Dam Rehabilitations
The ever increasing development and confidence in new and innovative technologies such as geosynthetics, in conjunction with often significant economic advantages, have led designers to...

Rehabilitation of the Deep Creek Lake Dam
This paper presents the rehabilitation design for upgrading the Deep Creek Lake dam. The Deep Creek dam is a rock fill dam, 92 feet (28 m) high and 1290 feet (393 m) long, and constructed...

Trial Lake Dam Reconstruction
Trial Lake Dam is located in the Uinta National Forest in Central Utah at an elevation of about 10,000 feet. The dam is 50 feet high and stores 1,700 acre-feet of water for downstream...

Seismic Safety Modification of an Old Earthfill Dam
Chollas Dam was built as a water supply reservoir for the City of San Diego. The reservoir is no longer a part of the municipal water system but has been operated since 1966 as a recreational...

Model Study of Center Hill Fuse Plug Spillway
Model tests of a fuseplug spillway mounted on the fixed crest of an embankment dam were conducted to develop a satisfactory design that would fail in a orderly fashion at a prescribed...

Large-Scale Embankment Overtopping Protection Tests
The U.S. Bureau of Reclamation (Reclamation), Colorado State University (CSU), and the Electric Power Research Institute (EPRI) have an ongoing cooperative research effort to determine...

Progressive Failure of an Overtopped Embankment
The failure of an overtopped embankment is a problem of a very complicated nature. Concerned organizations are interested in information that can be used in future planning and development...

RCC: Rehab Results
Thirty dams have been modified with roller compacted concrete in order to provide additional spillway capacity and for safe overtopping of embankment dams. In the national dam safety inspection...

The Optimum Gravity Dam
A method is presented for optimizing the cost of a dam by varying the properties of the material and the shape of the dam to produce the lowest cost water barrier to perform the required...

RCC for Rehabilitation of Dams in the USA-An Overview
The use of roller-compacted concrete (RCC) has rapidly become a powerful new tool in the USA for engineers involved with the rehabilitation of existing dams. Starting in 1980, RCC has...

Design and Proposed Construction Techniques for Pangue Dam
The paper describes the site conditions, design and proposed construction methods for the 115 m high Pangue Dam, Chile's first RCC dam. Trial mix design work and test embankments...

Concrete-Faced RCC Dams
In the past 10 years, roller compacted concrete (RCC) has gained wide acceptance as a cost effective material for constructing and rehabilitating dams. Since the first RCC dams had seepage...

Hydraulics of Stepped Spillways for RCC Dams and Dam Rehabilitations
Stepped spillways are natural extensions of roller-compacted concrete (RCC) placement techniques. Stepped spillways were first used with concrete dams, and designers are eager to use the...

Design of the Boney Falls RCC Emergency Spillway
The Boney Falls Emergency Spillway was designed as a mass roller compacted concrete structure. Alternative designs considered include a fuse plug, lowering the embankment and paving with...

Rehabilitating Small Earth Embankments with RCC
The rehabilitation of existing earth dams using roller compacted concrete (RCC) is gaining wider acceptance in the engineering and construction community. Presented herein is a discussion...

Dams Going Safely over the Top
Many older dams can't pass updated design floods without overtopping the embankment crest. Conventional upgrade methods, enlarging spillways or raising crests, are expensive....

 

 

 

 